Help
RSS
API
Feed
Maltego
Contact
Domain > www.arison.com.lb
×
More information on this domain is in
AlienVault OTX
Is this malicious?
Yes
No
DNS Resolutions
Date
IP Address
2015-03-30
85.112.85.5
(
ClassC
)
2024-07-13
134.213.154.97
(
ClassC
)
Port 80
HTTP/1.1 301 Moved PermanentlyDate: Sat, 13 Jul 2024 00:34:23 GMTServer: ApacheLocation: https://www.arison.com.lb/Content-Length: 234Content-Type: text/html; charsetiso-8859-1 !DOCTYPE HTML PUBLIC -//IETF//DTD HTML 2.0//EN>html>head>title>301 Moved Permanently/title>/head>body>h1>Moved Permanently/h1>p>The document has moved a hrefhttps://www.arison.com.lb/>here/a>./p>/body>/html>
Port 443
HTTP/1.1 200 OKDate: Sat, 13 Jul 2024 00:34:23 GMTServer: ApacheX-Powered-By: PHP/7.4.27Transfer-Encoding: chunkedContent-Type: text/html; charsetUTF-8 !DOCTYPE html>html langen>head> meta charsetutf-8 /> meta http-equivX-UA-Compatible contentIEedge /> meta nameviewport contentwidthdevice-width, initial-scale1 /> meta namedescription contentAt ARISON, we execute Electro‐Mechanical projects for all applications related to pumping and water treatment stations and hydraulic and electric sectors in private, public, and industrial fields, installation and commissioning of all our equipment’s are done by our well trained engineers and technicians, this service is a must in our forth going policy to success. Spares availability is definitely insured. /> title>ARISON sal/title> !-- Fav Icon --> link relicon hrefassets/imgs/arison-icon.png typeimage/x-icon /> !-- Google Fonts --> link hrefhttps://fonts.googleapis.com/css2?familySpartan:wght@300;400;500;600;700;800;900&displayswap relstylesheet /> link hrefhttps://fonts.googleapis.com/css2?familyOpen+Sans:ital,wght@0,300;0,400;0,600;0,700;0,800;1,300;1,400;1,600;1,700;1,800&displayswap relstylesheet /> !-- Stylesheets --> link hrefassets/css/font-awesome-all.css relstylesheet /> link hrefassets/css/flaticon.css relstylesheet /> link hrefassets/css/owl.css relstylesheet /> link hrefassets/css/bootstrap.css relstylesheet /> link hrefassets/css/jquery.fancybox.min.css relstylesheet /> link hrefassets/css/animate.css relstylesheet /> link hrefassets/css/jquery-ui.css relstylesheet /> link hrefassets/css/color.css relstylesheet /> link hrefassets/css/style.css relstylesheet /> link hrefassets/css/responsive.css relstylesheet /> link relstylesheet href./assets/css/custom.css /> !-- Font Awesome --> link hrefhttps://cdnjs.cloudflare.com/ajax/libs/font-awesome/6.0.0/css/all.min.css relstylesheet /> !-- Google Fonts --> link hrefhttps://fonts.googleapis.com/css?familyRoboto:300,400,500,700&displayswap relstylesheet /> !-- MDB --> link hrefhttps://cdnjs.cloudflare.com/ajax/libs/mdb-ui-kit/5.0.0/mdb.min.css relstylesheet /> link relstylesheet hrefhttps://cdn.jsdelivr.net/npm/swiper@9/swiper-bundle.min.css /> link relstylesheet href./assets/css/arison.css /> style> body { overflow-x: hidden; } .pattern-layer>* { width: 100% !important; } .swiper-button-next.swiper-button-disabled, .swiper-button-prev.swiper-button-disabled { opacity: 1.4; background-color: gray; } .owl-dots-none .owl-dots, .owl-nav-none .owl-nav { display: block !important; } .loader { width: 50px; padding: 8px; aspect-ratio: 1; border-radius: 50%; background: #0477bf; --_m: conic-gradient(#0000 10%, #000), linear-gradient(#000 0 0) content-box; -webkit-mask: var(--_m); mask: var(--_m); -webkit-mask-composite: source-out; mask-composite: subtract; animation: l3 1s infinite linear; margin: 0 auto 20px; } @keyframes l3 { to { transform: rotate(1turn) } } /style> style> .details-tab { padding: 0.5rem 1rem; font-size: 1.1rem; color: #ffffffcc; font-weight: 600; display: block; order: 0; background: #ffffff13; border-radius: 1.5rem; margin-right: 0.35rem; margin-bottom: 0.5rem; cursor: pointer; border: 2px solid transparent; } .details-tab:hover, .details-tab:focus { border-color: #fff; } .details-tab::-webkit-details-marker { display: none; } .details-tabs { position: relative; justify-content: center; display: flex; flex-wrap: wrap; } .details-content { order: 1; padding: 1rem; width: 100%; margin-top: 20px; } .details-content details { margin: 1.5rem; } .details-content details summary { font-weight: 600; } .details-item { display: contents; } .details-itemopen>.details-tab { background: #fff; color: #333; } .details-item .details-tab { border: 1px solid #0477bf; color: #0477bf; border-radius: 50px; padding: 5px 20px; margin: 0 5px; } .details-itemopen .details-tab { background-color: #0477bf; color: white; } /style>/head>!-- page wrapper -->body> div classboxed_wrapper> !-- json --> !-- json --> !-- preloader --> div classloader-wrap> div classpreloader> !-- div classpreloader-close>Preloader Close/div> --> div idhandle-preloader classhandle-preloader> div> div classloader>/div> img stylemax-width: 300px src./assets/imgs/arison-logo.png alt /> /div> /div> /div> /div> !-- preloader end --> !-- Header Start --> !-- main header -->header classmain-header> !-- header-lower --> div classheader-lower> div classcontainer> div classouter-box d-flex> div classlogo-box> figure classlogo> a href./>img src./assets/imgs/arison-logo.png altARISON Logo />/a> /figure> /div> div classmenu-area clearfix> !--Mobile Navigation Toggler--> div classmobile-nav-toggler> i classicon-bar>/i> i classicon-bar>/i> i classicon-bar>/i> /div> nav classmain-menu navbar-expand-md navbar-light> div classcollapse navbar-collapse show clearfix idnavbarSupportedContent> ul classnavigation clearfix> li>a href./>Home/a>/li> li>a href./#about>About Us/a>/li> !-- li>a href#services>Services/a>/li> --> li classdropdown> a href./#services>Services/a> ul> li>a href./water.php>Water/a>/li> li>a href./plant.php>Treatment Plant/a>/li> li>a href./power.php>Power Generation/a>/li> li>a href./solar.php>Solar System/a>/li> li>a href./contracting.php>Contracting/a>/li> li>a href./production.php>Production/a>/li> li>a href./maintenance.php>Maintenance/a>/li> /ul> /li> li>a href./#projects>Projects/a>/li> li>a href./#news>News/Events/a>/li> li>a href./#contact>Contact Us/a>/li> li> a classtheme-btn btn-one href./career.php>Careers/a> /li> /ul> /div> /nav> /div> /div> /div> /div> !--sticky Header--> div classsticky-header> div classcontainer> div classouter-box> div classlogo-box> figure classlogo> a href./>img srcassets/imgs/arison-logo.png alt />/a> /figure> /div> div classmenu-area clearfix> nav classmain-menu clearfix> !-- JS menu --> /nav> /div> /div> /div> /div>/header>!-- main-header end -->!-- Mobile Menu -->div classmobile-menu> div classmenu-backdrop>/div> div classclose-btn>i classfas fa-times>/i>/div> nav classmenu-box> div classnav-logo> a href./>img src./assets/imgs/arison-logo-white.png altwhite logo title />/a> /div> div classmenu-outer> !--Menu Will Come Automatically Via Javascript / Same Menu as in Header--> /div> div classcontact-info> h4>Contact Info/h4> ul> li>Beirut, lebanon/li> li>a hreftel:+9611864824>+ 961 (1) 864 824/a>/li> li> a hrefmailto:arison@arison.com.lb>arison@arison.com.lb/a> /li> /ul> /div> div classsocial-links> ul classclearfix> li> a target_blank hrefhttps://www.facebook.com/ArisonLebanon/>i classfab fa-facebook-f>/i>/a> /li> !-- li>a href>i classfab fa-twitter>/i>/a>/li> --> li> a target_blank hrefhttps://www.instagram.com/arison_lb/?hlen>i classfab fa-instagram>/i>/a> /li> li> a target_blank hrefhttps://www.linkedin.com/company/abdul-razzak-itani-&-sons-arison-/?original_refererhttps%3A%2F%2Fwww%2Egoogle%2Ecom%2F&originalSubdomainlb>i classfab fa-linkedin-in>/i>/a> /li> /ul> /div> /nav>/div>!-- End Mobile Menu --> !-- Header End --> !-- banner-section --> section idhome classbanner-section> div classslider> button typebutton idright classright namebutton> svg version1.1 idCapa_1 width40px height40px xmlnshttp://www.w3.org/2000/svg xmlns:xlinkhttp://www.w3.org/1999/xlink x0px y0px viewBox0 0 477.175 477.175 styleenable-background: new 0 0 477.175 477.175 xml:spacepreserve> g> path stylefill: #9d9d9d dM360.731,229.075l-225.1-225.1c-5.3-5.3-13.8-5.3-19.1,0s-5.3,13.8,0,19.1l215.5,215.5l-215.5,215.5 c-5.3,5.3-5.3,13.8,0,19.1c2.6,2.6,6.1,4,9.5,4c3.4,0,6.9-1.3,9.5-4l225.1-225.1C365.931,242.875,365.931,234.275,360.731,229.075z /> /g> /svg> /button> button typebutton idleft classleft namebutton> svg version1.1 idCapa_2 xmlnshttp://www.w3.org/2000/svg xmlns:xlinkhttp://www.w3.org/1999/xlink x0px y0px viewBox0 0 477.175 477.175 styleenable-background: new 0 0 477.175 477.175 xml:spacepreserve> g> path stylefill: #9d9d9d dM145.188,238.575l215.5-215.5c5.3-5.3,5.3-13.8,0-19.1s-13.8-5.3-19.1,0l-225.1,225.1c-5.3,5.3-5.3,13.8,0,19.1l225.1,225 c2.6,2.6,6.1,4,9.5,4s6.9-1.3,9.5-4c5.3-5.3,5.3-13.8,0-19.1L145.188,238.575z /> /g> /svg> /button> svg idsvg2 classup2 xmlnshttp://www.w3.org/2000/svg xmlns:xlinkhttp://www.w3.org/1999/xlink> circle idcircle1 classcircle1 steap cx0 cy50% r15% /> circle idcircle2 classcircle2 steap cx0 cy50% r30% /> circle idcircle3 classcircle3 steap cx0 cy50% r45% /> circle idcircle4 classcircle4 steap cx0 cy50% r60% /> circle idcircle5 classcircle5 steap cx0 cy50% r75% /> circle idcircle6 classcircle6 steap cx0 cy50% r90% /> circle idcircle7 classcircle7 steap cx0 cy50% r105% /> circle idcircle8 classcircle8 steap cx0 cy50% r120% /> circle idcircle9 classcircle9 steap cx0 cy50% r135% /> /svg> svg idsvg1 classup2 xmlnshttp://www.w3.org/2000/svg xmlns:xlinkhttp://www.w3.org/1999/xlink> circle idcircle10 classcircle10 steap cx100% cy50% r15% /> circle idcircle11 classcircle11 steap cx100% cy50% r30% /> circle idcircle12 classcircle12 steap cx100% cy50% r45% /> circle idcircle13 classcircle13 steap cx100% cy50% r60% /> circle idcircle14 classcircle14 steap cx100% cy50% r75% /> circle idcircle15 classcircle15 steap cx100% cy50% r90% /> circle idcircle16 classcircle16 steap cx100% cy50% r105% /> circle idcircle17 classcircle17 steap cx100% cy50% r120% /> circle idcircle18 classcircle18 steap cx100% cy50% r135% /> /svg> div idslide1 classslide1 up1> div classcontainer> !-- div classhero-text wow fadeInUp> p classsub-title>Welcome to/p> h1 classmain-title>Arison/h1> p classhero-description>“The Passion that is driven by Energy & Resources”/p> a href#about classtheme-btn btn-one>About Us/a> /div> --> /div> /div> div idslide2 classslide2> div classcontainer> !-- div classhero-text wow fadeInUp> p classsub-title>Welcome to/p> h1 classmain-title>Arison/h1> p classhero-description>“The Passion that is driven by Energy & Resources”/p> a href#about classtheme-btn btn-one>About Us/a> /div> --> /div> /div> div idslide3 classslide3> div classcontainer> !-- div classhero-text wow fadeInUp> p classsub-title>Welcome to/p> h1 classmain-title>Arison/h1> p classhero-description>“The Passion that is driven by Energy & Resources”/p> a href#about classtheme-btn btn-one>About Us/a> /div> --> /div> /div> div idslide4 classslide4> div classcontainer> !-- div classhero-text wow fadeInUp> p classsub-title>Welcome to/p> h1 classmain-title>Arison/h1> p classhero-description>“The Passion that is driven by Energy & Resources”/p> a href#about classtheme-btn btn-one>About Us/a> /div> --> /div> /div> div idslide5 classslide5> div classcontainer> !-- div classhero-text wow fadeInUp> p classsub-title>Welcome to/p> h1 classmain-title>Arison/h1> p classhero-description>“The Passion that is driven by Energy & Resources”/p> a href#about classtheme-btn btn-one>About Us/a> /div> --> /div> /div> div idslide6 classslide6> div classcontainer> !-- div classhero-text wow fadeInUp> p classsub-title>Welcome to/p> h1 classmain-title>Arison/h1> p classhero-description>“The Passion that is driven by Energy & Resources”/p> a href#about classtheme-btn btn-one>About Us/a> /div> --> /div> /div> div idslide7 classslide7> div classcontainer> !-- div classhero-text wow fadeInUp> p classsub-title>Welcome to/p> h1 classmain-title>Arison/h1> p classhero-description>“The Passion that is driven by Energy & Resources”/p> a href#about classtheme-btn btn-one>About Us/a> /div> --> /div> /div> div idslide8 classslide8> div classcontainer> !-- div classhero-text wow fadeInUp> p classsub-title>Welcome to/p> h1 classmain-title>Arison/h1> p classhero-description>“The Passion that is driven by Energy & Resources”/p> a href#about classtheme-btn btn-one>About Us/a> /div> --> /div> /div> div idslide9 classslide9> div classcontainer> !-- div classhero-text wow fadeInUp> p classsub-title>Welcome to/p> h1 classmain-title>Arison/h1> p classhero-description>“The Passion that is driven by Energy & Resources”/p> a href#about classtheme-btn btn-one>About Us/a> /div> --> /div> /div> div idslide10 classslide10> div classcontainer> !-- div classhero-text wow fadeInUp> p classsub-title>Welcome to/p> h1 classmain-title>Arison/h1> p classhero-description>“The Passion that is driven by Energy & Resources”/p> a href#about classtheme-btn btn-one>About Us/a> /div> --> /div> /div> div idslide11 classslide11> div classcontainer> !-- div classhero-text wow fadeInUp> p classsub-title>Welcome to/p> h1 classmain-title>Arison/h1> p classhero-description>“The Passion that is driven by Energy & Resources”/p> a href#about classtheme-btn btn-one>About Us/a> /div> --> /div> /div> /section> !-- banner-section end --> !-- about section --> section idabout classabout-style-two> div classauto-container> div classtitle-text wow fadeInUp data-wow-delay00ms data-wow-duration1500ms style visibility: visible; animation-duration: 1500ms; animation-delay: 0ms; animation-name: fadeInUp; > h2>About Us/h2> /div> section classfaq> nav> a classtab active> img src./assets/imgs/svgs/group-1-svgrepo-com.svg altabout icon classabout-icon /> About/a> a classtab>img src./assets/imgs/svgs/target-svgrepo-com.svg altmission icon classmission-icon /> Mission/a> a classtab>img src./assets/imgs/svgs/telescope-svgrepo-com.svg altvision icon classvision-icon /> Vision/a> /nav> section classcontent> p classactive> Founded in 1958, ARISON s.a.l, started its activities by both Trading, Installing and Servicing Water Pumps and Executing Turn-Key Projects in the Electro-mechanical field before venturing into the Power Generation Business, Water & Waste Water Treatment, Desalination Plants and Solar systems. br />br /> From these humble beginnings, the Company’s vision has helped it to grow and has driven it to quickly become a major regional player in the Water & Energy Sectors. ARISON s.a.l became the leading company in the Middle East, Gulf, Africa and now in Europe. br />br /> ARISON s.a.l currently occupies a State of Art Facility with a surface area of 5,000 m² comprising of R&D, design, production and testing facilities. These are equipped with the latest technologies and are managed by teams of professionals. /p> p> ARISON s.a.l has been dedicated to providing innovative solutions in the water pump, power generation, solar, waste water treatment, and contracting industries since 1958. Our mission is to consistently deliver high-quality products and services that meet the needs of our customers and exceed their expectations. We are committed to using the latest technology and best practices to ensure that our solutions are efficient, reliable, and environmentally sustainable. We are committed to being a responsible corporate citizen, and we strive to make a positive impact on the communities in which we operate. /p> p> We envision a future in which our products and services are recognized for their innovation, quality, and sustainability. our dedication to excellence and our commitment to social and environmental responsibility, will create a better future for all. /p> br /> a href./assets/certificates.pdf target_blank classtheme-btn btn-one btn-white>Check Our Certificates/a> /section> /section> /div> div classcontainer-fluid> div classrow wow fadeInUp justify-content-around data-wow-delay00ms data-wow-duration1500ms style visibility: visible; animation-duration: 1500ms; animation-delay: 0ms; animation-name: fadeInUp; > div classcol-xl-3 col-sm-6> div classicon-box> img classabout-imgs src./assets/imgs/about/a1.jpg alt /> /div> /div> div classcol-xl-3 col-sm-6 rem1> div classicon-box> img classabout-imgs src./assets/imgs/about/a5.jpg alt /> /div> /div> div classcol-xl-3 col-sm-6 rem3> div classicon-box> img classabout-imgs src./assets/imgs/about/a3.jpg alt /> /div> /div> div classcol-xl-3 col-sm-6 rem2> div classicon-box> img classabout-imgs src./assets/imgs/about/a6.jpg alt /> /div> /div> /div> /div> /section> !-- about section end --> !-- service-section --> section idservices classfeature-section light alternat-2 centred> div classpattern-layer> div classpattern-1 stylebackground-image: url(assets/imgs/shape/shape-25.png)>/div> div classpattern-2 stylebackground-image: url(assets/imgs/shape/shape-26.png)>/div> /div> div classcontainer-fluid> div classinner-container wow fadeInUp animated animated data-wow-delay00ms data-wow-duration1500ms style visibility: visible; animation-duration: 1500ms; animation-delay: 0ms; animation-name: fadeInUp; > div classtitle-text services-title> h2>Our Services/h2> /div> div classrow clearfix justify-content-center> div classcol-lg-3 col-md-6 col-sm-12 feature-block> div classfeature-block-one> div classinner-box> div classshape style background-image: url(assets/imgs/shape/shape-27.png); >/div> a hrefwater.php> div classicon-box> img src./assets/imgs/services/water.svg alt /> /div> h4>Water/h4> /a> p> water and sewage pumps, booster sets, pipes and valves. /p> /div> /div> /div> div classcol-lg-3 col-md-6 col-sm-12 feature-block> div classfeature-block-one> div classinner-box> div classshape d-none d-lg-block style background-image: url(assets/imgs/shape/shape-27.png); >/div> a hrefplant.php> div classicon-box> img src./assets/imgs/services/environment.svg alt /> /div> h4>Treatment Plant/h4> /a> p>water and waste water plants, desalination plants./p> /div> /div> /div> div classcol-lg-3 col-md-6 col-sm-12 feature-block> div classfeature-block-one> div classinner-box> div classshape d-none d-lg-block style background-image: url(assets/imgs/shape/shape-27.png); >/div> a hrefpower.php> div classicon-box> img src./assets/imgs/services/power.svg alt /> /div> h4>Power Generation/h4> /a> p> generating sets, power plants, aps, synchronising panels. /p> /div> /div> /div> div classcol-lg-3 col-md-6 col-sm-12 feature-block> div classfeature-block-one> div classinner-box> div classshape d-none d-lg-block style background-image: url(assets/imgs/shape/shape-27.png); >/div> a hrefsolar.php> div classicon-box> img src./assets/imgs/services/solar.svg alt /> /div> h4>Solar System/h4> /a> p> on and off grid systems, pv panels, battery, inverters and solar pumps. /p> /div> /div> /div> div classcol-lg-3 col-md-6 col-sm-12 feature-block> div classfeature-block-one> div classinner-box> div classshape d-none d-lg-block style background-image: url(assets/imgs/shape/shape-27.png); >/div> a hrefcontracting.php> div classicon-box> img src./assets/imgs/services/contracting.svg alt /> /div> h4>Contracting/h4> /a> p>epc./p> /div> /div> /div> div classcol-lg-3 col-md-6 col-sm-12 feature-block> div classfeature-block-one> div classinner-box> div classshape d-none d-lg-block style background-image: url(assets/imgs/shape/shape-27.png); >/div> a hrefproduction.php> div classicon-box> img src./assets/imgs/services/production.svg alt /> /div> h4>Production/h4> /a> p>machines to manufacture/assemble fuel tanks./p> /div> /div> /div> div classcol-lg-3 col-md-6 col-sm-12 feature-block> div classfeature-block-one> div classinner-box> a hrefmaintenance.php> div classicon-box> img src./assets/imgs/services/M.svg alt /> /div> h4>Maintenance/h4> /a> p>pumps, water, disiel engines./p> /div> /div> /div> /div> /div> /div> /section> !-- service-section end --> !-- news section --> section idpartners classcontact-style-two style/* background: linear-gradient(to bottom,var(--var-color-white-blue),white); */> div classauto-container> div classinfo-inner mt-5 w-100> div classcol-12> div classtitle-text wow fadeInUp data-wow-delay00ms data-wow-duration1500ms style visibility: visible; animation-duration: 1500ms; animation-delay: 0ms; animation-name: fadeInUp; > h2 styletext-align: center; margin-bottom: 40px> Our Partners /h2> /div> div classdetails-tabs> details classdetails-item open> summary classdetails-tab>Water/summary> div classdetails-content> div classfour-item-carousel owl-carousel owl-theme owl-nav-none> div> img src./assets/imgs/partners/water/w1.png alt /> !-- p classpartner-pill water>Water/p> --> /div> div> img src./assets/imgs/partners/water/w2.png alt /> !-- p classpartner-pill water>Water/p> --> /div> div> img src./assets/imgs/partners/water/w3.png alt /> !-- p classpartner-pill water>Water/p> --> /div> div> img src./assets/imgs/partners/water/w4.png alt /> !-- p classpartner-pill water>Water/p> --> /div> div> img src./assets/imgs/partners/water/w5.png alt /> !-- p classpartner-pill water>Water/p> --> /div> div> img src./assets/imgs/partners/water/w6.png alt /> !-- p classpartner-pill water>Water/p> --> /div> div> img src./assets/imgs/partners/water/w7.png alt /> !-- p classpartner-pill water>Water/p> --> /div> div> img src./assets/imgs/partners/water/w8.png alt /> !-- p classpartner-pill water>Water/p> --> /div> div> img src./assets/imgs/partners/water/w9.png alt /> !-- p classpartner-pill water>Water/p> --> /div> div> img src./assets/imgs/partners/water/w10.png alt /> !-- p classpartner-pill water>Water/p> --> /div> div> img src./assets/imgs/partners/water/w11.png alt /> !-- p classpartner-pill water>Water/p> --> /div> div> img src./assets/imgs/partners/water/w12.png alt /> !-- p classpartner-pill water>Water/p> --> /div> div> img src./assets/imgs/partners/water/w13.png alt /> !-- p classpartner-pill water>Water/p> --> /div> div> img src./assets/imgs/partners/water/w14.png alt /> !-- p classpartner-pill water>Water/p> --> /div> div> img src./assets/imgs/partners/water/w15.png alt /> !-- p classpartner-pill water>Water/p> --> /div> div> img src./assets/imgs/partners/water/w16.png alt /> !-- p classpartner-pill water>Water/p> --> /div> div> img src./assets/imgs/partners/water/w17.png alt /> !-- p classpartner-pill water>Water/p> --> /div> div> img src./assets/imgs/partners/water/w18.png alt /> !-- p classpartner-pill water>Water/p> --> /div> div> img src./assets/imgs/partners/water/w19.png alt /> !-- p classpartner-pill water>Water/p> --> /div> div> img src./assets/imgs/partners/water/w20.png alt /> !-- p classpartner-pill water>Water/p> --> /div> div> img src./assets/imgs/partners/water/w21.png alt /> !-- p classpartner-pill water>Water/p> --> /div> div> img src./assets/imgs/partners/water/w22.png alt /> !-- p classpartner-pill water>Water/p> --> /div> div> img src./assets/imgs/partners/water/w23.png alt /> !-- p classpartner-pill water>Water/p> --> /div> /div> /div> /details> details classdetails-item> summary classdetails-tab>Power/summary> div classdetails-content> div classfour-item-carousel owl-carousel owl-theme owl-nav-none> div> img src./assets/imgs/partners/power/p1.png alt /> !-- p classpartner-pill power>Power/p> --> /div> div> img src./assets/imgs/partners/power/p2.png alt /> !-- p classpartner-pill power>Power/p> --> /div> div> img src./assets/imgs/partners/power/p3.png alt /> !-- p classpartner-pill power>Power/p> --> /div> div> img src./assets/imgs/partners/power/p4.png alt /> !-- p classpartner-pill power>Power/p> --> /div> div> img src./assets/imgs/partners/power/p5.png alt /> !-- p classpartner-pill power>Power/p> --> /div> div> img src./assets/imgs/partners/power/p6.png alt /> !-- p classpartner-pill power>Power/p> --> /div> div> img src./assets/imgs/partners/power/p7.png alt /> !-- p classpartner-pill power>Power/p> --> /div> div> img src./assets/imgs/partners/power/p8.png alt /> !-- p classpartner-pill power>Power/p> --> /div> div> img src./assets/imgs/partners/power/p9.png alt /> !-- p classpartner-pill power>Power/p> --> /div> div> img src./assets/imgs/partners/power/p10.png alt /> !-- p classpartner-pill power>Power/p> --> /div> /div> /div> /details> details classdetails-item> summary classdetails-tab>Solar/summary> div classdetails-content> div classfour-item-carousel owl-carousel owl-theme owl-nav-none> div> img src./assets/imgs/partners/solar/s1.png alt /> !-- p classpartner-pill solar>Solar/p> --> /div> div> img src./assets/imgs/partners/solar/s2.png alt /> !-- p classpartner-pill solar>Solar/p> --> /div> div> img src./assets/imgs/partners/solar/s3.png alt /> !-- p classpartner-pill solar>Solar/p> --> /div> div> img src./assets/imgs/partners/solar/s4.png alt /> !-- p classpartner-pill solar>Solar/p> --> /div> div> img src./assets/imgs/partners/solar/s5.png alt /> !-- p classpartner-pill solar>Solar/p> --> /div> div> img src./assets/imgs/partners/solar/s6.png alt /> !-- p classpartner-pill solar>Solar/p> --> /div> div> img src./assets/imgs/partners/solar/s7.png alt /> !-- p classpartner-pill solar>Solar/p> --> /div> div> img src./assets/imgs/partners/solar/s8.png alt /> !-- p classpartner-pill solar>Solar/p> --> /div> /div> /div> /details> /div> /div> /div> /div> /div> /section> !-- ceo-section --> section idfounder classcta-section bg-color-2 mb-5> div classpattern-layer> div classpattern-1 stylebackground-image: url(assets/imgs/shape/shape-10.png)>/div> div classpattern-2 stylebackground-image: url(assets/imgs/shape/shape-2.png)>/div> div classpattern-3 stylebackground-image: url(assets/imgs/shape/shape-33.png)>/div> div classpattern-4 stylebackground-image: url(assets/imgs/shape/shape-34.png)>/div> /div> div classcontainer> div classrow clearfix justify-content-between align-items-center> div classcol-lg-7 col-md-12 col-sm-12 content-column> div classcontent_block_3> div classcontent-box wow fadeInUp data-wow-delay00ms data-wow-duration1500ms style visibility: visible; animation-duration: 1500ms; animation-delay: 0ms; animation-name: fadeInUp; > div classsec-title light> h3 stylecolor: white !important;>From Vision to Innovation /h3> h2>The ARISON Journey Through Time/h2> /div> div classtext mb-5> p> In the pivotal year of 1958, the visionary Abdul Razzak Itani laid the foundation for ARISON. Amidst a landscape of opportunities and limited technological strides, our forward-thinking founder, Abdul Razzak Itani, recognized the fundamental role of water pumps in Lebanons scarcity-prone environment. Fuelled by a passion for precision engineering and an acute understanding of evolving sector needs, the daring entrepreneur established a company dedicated to pioneering water pump solutions. br />br /> Driven by a solid commitment to excellence, our founder aimed to meet the demands of a rapidly growing industrial landscape, providing reliable and efficient solutions that would become the cornerstone of countless projects. Little did he know, this bold venture in 1958 would sow the seeds for a legacy seamlessly woven into the fabric of modern engineering. It embarked on a transformative journey, unifying the realms of Water, Power, and Solar. br />br /> With a profound commitment to engineering excellence and a vision for driving industrial progress, Abdul Razzak Itani passed the torch to his three sons and daughter - Abdallah, Mohammad, Nada, and Ahmad. Together, they expanded the business into electromechanical contracting, production, maintenance, power generation, water treatment, and solar systems, meeting the burgeoning demands of the region. br />br /> As the decades unfolded, our commitment to excellence became synonymous with our brand. br />br /> Today, we proudly stand as a testament to the enduring legacy of innovation that took root in 1958, and we continue to thrive, grow, and innovate. br />br /> Welcome to ARISON - where our history meets the future. br />br /> !-- span classceo-span>~ Ahmad Itani/span> --> /p> /div> /div> /div> /div> div classcol-lg-4 col-md-12 col-sm-12 content-column> img src./assets/imgs/founder.jpg alt /> /div> /div> /div> /section> section idfounder classcta-section bg-color-2 mt-5> div classpattern-layer> div classpattern-1 stylebackground-image: url(assets/imgs/shape/shape-10.png)>/div> div classpattern-2 stylebackground-image: url(assets/imgs/shape/shape-2.png)>/div> div classpattern-3 stylebackground-image: url(assets/imgs/shape/shape-33.png)>/div> div classpattern-4 stylebackground-image: url(assets/imgs/shape/shape-34.png)>/div> /div> div classcontainer> div classrow clearfix justify-content-between align-items-center> div classcol-lg-12 col-md-12 col-sm-12 content-column m-auto> div classcontent_block_3> div classcontent-box wow fadeInUp data-wow-delay00ms data-wow-duration1500ms style visibility: visible; animation-duration: 1500ms; animation-delay: 0ms; animation-name: fadeInUp; > div classsec-title light text-center> h2>General Managers Word/h2> /div> div classtext text-center> p> Many of you have known ARISON s.a.l. as a leading provider of high-quality Water Pumps, Power Generators, Water & Waste Water Treatment Plants, Desalination Plants, Solar Equipment & Systems, and many other complimentary products and services in our industry. We have been serving Lebanon and the region since 1958 and I wanted to take this opportunity to express my sincere gratitude for your continued support and partnership over the years. br /> br /> At ARISON s.a.l., we are committed to delivering the highest level of customer satisfaction through our innovative and reliable products and services. We are constantly striving to improve our offerings and are proud to be a trusted partner to so many businesses in the industry. As we look ahead, we are excited to share with you some of the exciting developments and new products that we have in the works. We are confident that these will help to further enhance your experience with ARISON s.a.l and provide even more value to your business. We are proud to have team of skilled assets who were and will remain the reason of our success and distinguishment in the Mena region as well as Europe. br />br /> We value your feedback and would love to hear from you on how we can continue to serve you better. br /> Thank you again for your support and partnership. We look forward to continuing to work with you in the future. br />br /> Sincerely, span classceo-span>~ Ahmad Itani/span> /p> /div> !-- span classceo-span>~ Ahmad Itani/span> --> /div> /div> /div> /div> /div> /section> !-- ceo-section end --> !-- gallery-section --> section idprojects classgallery-section centred stylebackground: white; padding: 120px 0 0> div classauto-container> div classtitle-text wow fadeInUp data-wow-delay00ms data-wow-duration1500ms style visibility: visible; animation-duration: 1500ms; animation-delay: 0ms; animation-name: fadeInUp; > h2>Our Projects/h2> /div> div classsortable-masonry wow fadeInUp data-wow-delay00ms data-wow-duration1500ms style visibility: visible; animation-duration: 1500ms; animation-delay: 0ms; animation-name: fadeInUp; > div classfilters wow fadeInUp data-wow-delay00ms data-wow-duration1500ms> ul classfilter-tabs filter-btns clearfix> li classactive filter data-rolebutton data-filter.water>Water/li> li classfilter data-rolebutton data-filter.treatment-plant>Treatment Plant/li> li classfilter data-rolebutton data-filter.power-generation>Power Generation/li> li classfilter data-rolebutton data-filter.solar-system>Solar System/li> /ul> /div> div classitems-container row clearfix align-items-center justify-content-center> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-34> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/rehabilitation-daychounieh/1.jpg altRehabilitation of Daychounieh Pumping Station, Construction and Equipping of New Pumping Room styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Rehabilitation of Daychounieh Pumping Station, Construction and Equipping of New Pumping Room /h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-1> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/aramoun-project-zone-c/1.jpg altConstruction of Aramoun Sud Bas Booster Pumping Station styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Construction of Aramoun Sud Bas Booster Pumping Station/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-2> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/naameh-project-zone-c/1.jpg altConstruction of Naameh Nord Bas Booster Pumping Station styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Construction of Naameh Nord Bas Booster Pumping Station/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-3> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/khaldeh-project-zone-c/1.jpg altConstruction of Khalde Bas Booster Pumping Station styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Construction of Khalde Bas Booster Pumping Station/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-4> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/qobbe-project-zone-c/1.jpg altConstruction of Qobbe Bas 1 - Qobbe Haut Booster Pumping Station styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Construction of Qobbe Bas 1 - Qobbe Haut Booster Pumping Station /h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-5> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/qobbe-project-zone-c/2.jpg altConstruction of Qobbe Bas 2 - Oumara Booster Pumping Station styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Construction of Qobbe Bas 2 - Oumara Booster Pumping Station/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-6> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/choueifat-bp-station-zone-c/1.jpg altConstruction of Choueifat Bas Booster Pumping Station styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Construction of Choueifat Bas Booster Pumping Station/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-7> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/kfarchima-bp-station-zone-c/1.jpg altConstruction of Kfarchima Bas Booster Pumping Station styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Construction of Kfarchima Bas Booster Pumping Station/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-8> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/kfarchima-bp-station-zone-c/2.jpg altConstruction of Kfarchima Haut Booster Pumping Station styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Construction of Kfarchima Haut Booster Pumping Station/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-9> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/cap-sur-ville/1.jpg altConstruction of Cap Sur Ville Booster Pumping Station styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Construction of Cap Sur Ville Booster Pumping Station/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-10> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/el-aamariye-project/1.jpg altConstruction of El-Aamriye (Fanar Bas) Booster Pumping Station styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Construction of El-Aamriye (Fanar Bas) Booster Pumping Station/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-11> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/ain-al-asaad-project/1.jpg altEquipping of Pumping Station in Ain El Asaad styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Equipping of Pumping Station in Ain El Asaad/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-12> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/darya-villages/1.jpg altEquipping of Pumping Station in Darya Villages styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Equipping of Pumping Station in Darya Villages/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-13> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/jradeh-station-project/1.jpg altRehabilitation of Jradeh Pumping Station styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Rehabilitation of Jradeh Pumping Station/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-14> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/joun-barja-reservoirs/1.jpg altConstruction of Two Reservoirs (Joun and Barja) and Rehabilitation of One Spring (Ein El Delbeh) styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Construction of Two Reservoirs (Joun and Barja) and Rehabilitation of One Spring (Ein El Delbeh)/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-15> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/houmal-wp-station/1.jpg altEquipping of Houmal’s Well and Pumping Station styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Equipping of Houmal’s Well and Pumping Station/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-16> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/tallet-el-khayat/1.jpg altRehabilitation of Tallet El Khayyat Pumping Station styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Rehabilitation of Tallet El Khayyat Pumping Station/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-17> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/nahr-el-kaleb/1.jpg altEquipping of Nahr El Kaleb Boreholes styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Equipping of Nahr El Kaleb Boreholes/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-18> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/dbayeh-pumping-station/1.jpg altRehabilitation of Dbayeh Pumping Station styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Rehabilitation of Dbayeh Pumping Station/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-19> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/qalaat-project/1.jpg altConstruction of Electro-mechnical System and PV Solar System for Qalhat Elevated Reservoir styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Construction of Electro-mechnical System and PV Solar System for Qalhat Elevated Reservoir/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-20> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/rachaaine-rahbe-bazoun/1.jpg altUpgrade of Potable Water Facilities in Rachaaine, Rahbe and Bazoun villages for the North Lebanon Water Establishment (NLWE) styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Upgrade of Potable Water Facilities in Rachaaine, Rahbe and Bazoun villages for the North Lebanon Water Establishment (NLWE)/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-21> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/mansourieh-wp-station/1.jpg altConstruction of Mansourieh Water Pumping Station styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Construction of Mansourieh Water Pumping Station/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-22> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/wazzaneh-wp-station/1.jpg altConstruction of Wazzaneh Water Pumping Station styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Construction of Wazzaneh Water Pumping Station/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-23> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/batoulay-wp-station/1.jpg altConstruction of Batoulay Water Pumping Station styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Construction of Batoulay Water Pumping Station/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-24> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/aya-tower/1.jpg altSupply and Installation for Aya Tower styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Supply and Installation for Aya Tower/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-25> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/nerve-disease-hospital/1.jpg altSupply and Installation of EN12845 Fire Fighting Unit for Nerve Disease Hospital styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Supply and Installation of EN12845 Fire Fighting Unit for Nerve Disease Hospital/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-26> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/aswak-beirut/1.jpg altSupply and Installation of NFPA20 Fire Fighting Unit and Booster Set in Aswak Beirut styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Supply and Installation of NFPA20 Fire Fighting Unit and Booster Set in Aswak Beirut/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-27> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/pump-series-for-ro-plant/1.jpg altSupply and Installation Vertical Pumps in Series styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Supply and Installation Vertical Pumps in Series/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-28> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/hasbaya-hospital/1.jpg altSupply and Installation of Booster Pumpsets for Hasbaya Hospital styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Supply and Installation of Booster Pumpsets for Hasbaya Hospital/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-29> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/b11/1.jpg altSupply and Installation for B11 styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Supply and Installation for B11/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-30> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/itco-fire/1.jpg altSupply and Installation of Fire Fighting Unit for ITCO styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Supply and Installation of Fire Fighting Unit for ITCO/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-31> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/private-project/1.jpg altSupply and Installation of Packaged Booster Sets styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Supply and Installation of Packaged Booster Sets/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-32> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/sadco/1.jpg altSupply and Installation of Sewage Pumps for SADCO Warehouse styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Supply and Installation of Sewage Pumps for SADCO Warehouse/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column water> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#water-33> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/water/pepsi-factory/1.jpg altSupply and Installation of Booster Pumpset for Pepsi Cola Factory styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Supply and Installation of Booster Pumpset for Pepsi Cola Factory/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column treatment-plant> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#treatment-plant-1> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/treatment-plant/amidy-project/1.jpg altDesign, Build and Operate of Amidy Water Project styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Design, Build and Operate of Amidy Water Project/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column treatment-plant> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#treatment-plant-2> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/treatment-plant/hadath/1.jpg altConstruction of a Hadath Desalination Plant styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Construction of a Hadath Desalination Plant/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column treatment-plant> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#treatment-plant-3> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/treatment-plant/zahle-project/1.jpg altEquipping of 3 Wells in Zahle Region and Electro-mechanical Rehabilitation Works for Zahle Intermediate Reservoir, Water Treatment Plant and Pumping Station styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Equipping of 3 Wells in Zahle Region and Electro-mechanical Rehabilitation Works for Zahle Intermediate Reservoir, Water Treatment Plant and Pumping Station/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column treatment-plant> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#treatment-plant-4> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/treatment-plant/private-project/1.jpg altSupply and Installation for RO unit styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Supply and Installation for RO unit/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column power-generation> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#power-generation-1> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/power-generation/dai/1.jpg altSupply and Installation of Generators for Water Pumping Stations styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Supply and Installation of Generators for Water Pumping Stations/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column power-generation> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#power-generation-2> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/supply-generators-for-water/1.jpg altSupply and Installation of Generators for Water Pumping Stations styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Supply and Installation of Generators for Water Pumping Stations/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column solar-system> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#solar-13> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/solar-system/supply-installation/1.jpg altSupply and Installation of PV System for Dar Baachtar Well (North Lebanon) styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Supply and Installation of PV System for Dar Baachtar Well (North Lebanon)/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column solar-system> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#solar-1> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/solar-system/sada-pack/1.jpg altInstallation of PV Solar System for Sada Pack styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Installation of PV Solar System for Sada Pack/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column solar-system> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#solar-2> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/solar-system/jib-jennine-waste-water/1.jpg altInstallation of PV Solar System for Jib Jennine Waste Water Treatment Plant styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Installation of PV Solar System for Jib Jennine Waste Water Treatment Plant/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column solar-system> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#solar-3> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/solar-system/amioun/1.jpg altInstallation of PV Solar System for Amioun Waste Water Recycling Plant styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Installation of PV Solar System for Amioun Waste Water Recycling Plant/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column solar-system> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#solar-4> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/solar-system/arsal/1.jpg altInstallation of PV Solar System for Arsal Waste Water Recycling Plant styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Installation of PV Solar System for Arsal Waste Water Recycling Plant/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column solar-system> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#solar-5> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/solar-system/sakr-plant/1.jpg altInstallation of PV Solar System for Sakr Plant styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Installation of PV Solar System for Sakr Plant/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column solar-system> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#solar-6> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/solar-system/alma-el-chaab/1.jpg altInstallation of PV Solar System for Alma El Chaab styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Installation of PV Solar System for Alma El Chaab/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column solar-system> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#solar-7> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/solar-system/hasbaya/1.jpg altInstallation of PV Solar System for Hasbaya styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Installation of PV Solar System for Hasbaya/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column solar-system> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#solar-8> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/solar-system/fekha/1.jpg altInstallation of PV Solar System for Fekha styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Installation of PV Solar System for Fekha/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column solar-system> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#solar-9> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/solar-system/abasieh/1.jpg altInstallation of PV Solar System for Abasieh styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Installation of PV Solar System for Abasieh/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column solar-system> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#solar-10> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/solar-system/iaat/1.jpg altInstallation of PV Solar System for Iaat styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Installation of PV Solar System for Iaat/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column solar-system> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#solar-11> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/solar-system/qalhat/1.jpg altInstallation of PV Solar System for Qalhat styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Installation of PV Solar System for Qalhat/h2> /div> /figcaption> /div> /div> /div> div classcol-lg-4 col-md-6 col-sm-12 masonry-item small-column solar-system> div classgallery-block-one> div classproject-item inner-box data-togglemodal data-target#solar-12> figure classeffect-honey image-box> img loadinglazy src./assets/imgs/projects/solar-system/qaa/1.jpg altInstallation of PV Solar System for Qaa styleobject-fit: cover /> /figure> figcaption> div classcontent> h2 classname>Installation of PV Solar System for Qaa/h2> /div> /figcaption> /div> /div> /div> /div> div classshow-more d-flex justify-content-center> button classtheme-btn btn-one>Show More/button> /div> /div> /div> /section> !-- gallery-section end --> !-- ceo-section --> section idceo styledisplay: none !important classcta-section bg-color-2> div classpattern-layer> div classpattern-1 stylebackground-image: url(assets/imgs/shape/shape-10.png)>/div> div classpattern-2 stylebackground-image: url(assets/imgs/shape/shape-2.png)>/div> div classpattern-3 stylebackground-image: url(assets/imgs/shape/shape-33.png)>/div> div classpattern-4 stylebackground-image: url(assets/imgs/shape/shape-34.png)>/div> /div> div classcontainer> div classrow clearfix justify-content-between align-items-center> div classcol-lg-12 col-md-12 col-sm-12 content-column m-auto> div classcontent_block_3> div classcontent-box wow fadeInUp data-wow-delay00ms data-wow-duration1500ms style visibility: visible; animation-duration: 1500ms; animation-delay: 0ms; animation-name: fadeInUp; > div classsec-title light text-center> h2>General Managers Word/h2> /div> div classtext text-center> p> Many of you have known ARISON s.a.l. as a leading provider of high-quality Water Pumps, Power Generators, Water & Waste Water Treatment Plants, Desalination Plants, Solar Equipment & Systems, and many other complimentary products and services in our industry. We have been serving Lebanon and the region since 1958 and I wanted to take this opportunity to express my sincere gratitude for your continued support and partnership over the years. br /> br /> At ARISON s.a.l., we are committed to delivering the highest level of customer satisfaction through our innovative and reliable products and services. We are constantly striving to improve our offerings and are proud to be a trusted partner to so many businesses in the industry. As we look ahead, we are excited to share with you some of the exciting developments and new products that we have in the works. We are confident that these will help to further enhance your experience with ARISON s.a.l and provide even more value to your business. We are proud to have team of skilled assets who were and will remain the reason of our success and distinguishment in the Mena region as well as Europe. br />br /> We value your feedback and would love to hear from you on how we can continue to serve you better. br /> Thank you again for your support and partnership. We look forward to continuing to work with you in the future. br />br /> Sincerely, span classceo-span>~ Ahmad Itani/span> /p> /div> !-- span classceo-span>~ Ahmad Itani/span> --> /div> /div> /div> /div> /div> /section> !-- ceo-section end --> !-- news section --> section idnews classcontact-style-two stylebackground-color: white> div classauto-container> div classinfo-inner mt-5 w-100> div classcol-12> div classtitle-text wow fadeInUp data-wow-delay00ms data-wow-duration1500ms style visibility: visible; animation-duration: 1500ms; animation-delay: 0ms; animation-name: fadeInUp; > h2 styletext-align: center; margin-bottom: 80px> News & Events /h2> /div> div classtwo-column-carousel owl-carousel owl-theme owl-nav-none> div> div classinner-box> figure classauthor-thumb stylejustify-content: center> video classvideo-border width100% height350 controls muted loop preloadnone styleobject-fit: cover> source src./assets/videos/news-events/arison-final.mp4 /> /video> /figure> div classinner> h5 styletext-align: center; margin-bottom: 20px> ARISON Industrial Plant /h5> /div> /div> /div> div> div classinner-box> figure classauthor-thumb stylejustify-content: center> video classvideo-border width100% height350 controls muted loop preloadnone styleobject-fit: cover> source src./assets/videos/news-events/Assembly of Gensets Video in ARISON Indistrial Plant.mp4 /> /video> /figure> div classinner> h5 styletext-align: center; margin-bottom: 20px> Assembly of Gensets in ARISON Indistrial Plant /h5> /div> /div> /div> /div> /div> /div> /div> /section> !-- news section end --> !-- branches-showrooms --> section idbs classcontact-style-two cta-section bg-color-2> div classpattern-layer> div classpattern-1 stylebackground-image: url(assets/imgs/shape/shape-10.png)>/div> div classpattern-2 stylebackground-image: url(assets/imgs/shape/shape-2.png)>/div> div classpattern-3 stylebackground-image: url(assets/imgs/shape/shape-33.png)>/div> div classpattern-4 stylebackground-image: url(assets/imgs/shape/shape-34.png)>/div> /div> div classauto-container> div classrow wow fadeInUp data-wow-delay00ms data-wow-duration1500ms style visibility: visible; animation-duration: 1500ms; animation-delay: 0ms; animation-name: fadeInUp; > div classinfo-inner mt-5 w-100> div classcol-12> div classsec-title light text-center> h2>Our Showrooms/h2> /div> div classtwo-column-carousel owl-carousel owl-theme owl-nav-none> div classtestimonial-block-one> div classinner-box> figure classauthor-thumb> img src./assets/imgs/rasbeirut.jpg alt /> /figure> div classinner> h3>Kraytem Branch/h3> h5> Khalid Bin Walid St., Itani Bldg., Beirut - Lebanon /h5> p> Tel: a hreftel:+9611793900>+961 1 793 900/a> br /> Mob: a hreftel:+9613287936>+961 3 287 936/a> /p> !-- span classdesignation>Designer/span> --> /div> /div> /div> div classtestimonial-block-one> div classinner-box> figure classauthor-thumb> img src./assets/imgs/Aramoun.jpg alt /> /figure> div classinner> h3>Aramoun Branch/h3> h5> Aramoun Main Road, Facing Universal School /h5> p> !-- Phone: a hreftel:+9611793900>+961 (1) 793 900/a> br /> --> Tel: a hreftel:+9615814652>+961 5 814 652/a>br />br /> /p> !-- span classdesignation>Designer/span> --> /div> /div> /div> div classtestimonial-block-one> div classinner-box> figure classauthor-thumb> img src./assets/imgs/tripoli.jpg alt /> /figure> div classinner> h3>Tripoli Branch/h3> h5> Zehriye, Rafic Al Hariri St., Sheick & Soboh Bldg. /h5> p> Tel: a hreftel:+9616441899>+961 6 441 899/a> br>br> !-- br /> Fax: a hreftel:+9616442945>+961 (6) 442 945/a> --> /p> !-- span classdesignation>Designer/span> --> /div> /div> /div> !-- div classtestimonial-block-one> div classinner-box> figure classauthor-thumb>img src./assets/imgs/gallery/DJI_0005-1024x768.jpg alt>/figure> div classinner> h5>Jdeideh, br> Gulf Tower, br> Sin El Fil Blvd/h5>br> p> Phone: a hreftel:+9611879979>+961 (1) 879 979/a> br /> Fax: a hreftel:+9611876997>+961 (1) 876 997/a> /p> /div> /div> /div> --> div classtestimonial-block-one> div classinner-box> figure classauthor-thumb> img src./assets/imgs/saida.jpg alt /> /figure> div classinner> h3>Ghazieh Branch/h3> h5> Sea Side Road Facing Public Beach, Al Adil. /h5> p> Tel: a hreftel:+9617220078>+961 7 220 078/a> br />br /> /p> !-- span classdesignation>Designer/span> --> /div> /div> /div> /div> /div> /div> /div> div classtitle-text wow fadeInUp animated data-wow-delay00ms data-wow-duration1500ms style visibility: visible; animation-duration: 1500ms; animation-delay: 0ms; animation-name: fadeInUp; > h2 styletext-align: center; margin-bottom: 80px; color: #ffffff> ARISON is present in different Middle Eastern Countries as well as in Europe. /h2> /div> div classrow clearfix> div classcol-lg-4 col-md-12 col-sm-12 info-column wow fadeInUp data-wow-delay00ms data-wow-duration1500ms style visibility: visible; animation-duration: 1500ms; animation-delay: 0ms; animation-name: fadeInUp; > div classinfo-inner> h3 stylecolor: #ffffff> ARISON Gulf LTD, U.A.E /h3> ul classinfo-list clearfix> li> i classfas fa-map-marker-alt>/i> h5 stylecolor: #ffffff>Office Location/h5> p stylecolor: #ffffff> Address: i classflag flag-ae>/i> Abu Dhabi, Mourour Road, br> Guardian Towers, Office Bldg /p> /li> li> i classfas fa-envelope-open>/i> h5 stylecolor: #ffffff>Email Us/h5> p stylecolor: #ffffff>a stylecolor: #ffffff hrefmailto:info@arisongulf.com>info@arisongulf.com/a>/p> /li> !-- li> i classfas fa-phone>/i> h5>Call Us/h5> p> Phone: a hreftel:+97125554144>+ 971 (2) 555 41 44/a> br /> Fax: a hreftel:+97125554146>+ 971 (2) 555 41 46/a> /p> /li> --> li> i classfas fa-globe>/i> h5 stylecolor: #ffffff>Visit Our Website/h5> p stylecolor: #ffffff> a hrefhttp://www.arisongulf.com/ stylecolor: #ffffff>www.arisongulf.com/a> /p> /li> /ul> /div> /div> !-- div classcol-lg-6 col-md-12 col-sm-12 info-column wow fadeInUp data-wow-delay00ms data-wow-duration1500ms style visibility: visible; animation-duration: 1500ms; animation-delay: 0ms; animation-name: fadeInUp; > div classinfo-inner> h3>Branch Office, ARISON Gulf LTD, U.A.E/h3> ul classinfo-list clearfix> li> i classfas fa-map-marker-alt>/i> h5>Office Location/h5> p> Address: i classflag flag-ae>/i>Dubai Investments Park, Dubai br /> P.O.Box: Box 296242, Dubai- UAE /p> /li> li> i classfas fa-globe>/i> h5>Visit Our Website/h5> p> a hrefhttp://www.arisongulf.com/>www.arisongulf.com/a> /p> /li> /ul> /div> /div> --> div classcol-lg-4 col-md-12 col-sm-12 info-column wow fadeInUp data-wow-delay00ms data-wow-duration1500ms style visibility: visible; animation-duration: 1500ms; animation-delay: 0ms; animation-name: fadeInUp; > div classinfo-inner> h3 stylecolor: #ffffff>ARISON SAL, IRAQ /h3> ul classinfo-list clearfix> li> i classfas fa-map-marker-alt>/i> h5 stylecolor: #ffffff>Office Location/h5> p stylecolor: #ffffff> Address: i classflag flag-iq>/i>Street #60, Near Kadir Bila Mosque – Erbil, Kurdistan br /> !-- P.O.Box: 59/0239 Erbil --> /p> /li> li> i classfas fa-envelope-open>/i> h5 stylecolor: #ffffff>Email Us/h5> p stylecolor: #ffffff>a stylecolor: #ffffff hrefmailto:info@arisoniraq.com>info@arisoniraq.com/a>/p> /li> !-- li> i classfas fa-phone>/i> h5>Call Us/h5> p> Phone: a hreftel:+97125554144>+ 971 (2) 555 41 44/a> br /> Fax: a hreftel:+97125554146>+ 971 (2) 555 41 46/a> /p> /li> --> li> i classfas fa-globe>/i> h5 stylecolor: #ffffff>Visit Our Website/h5> p> a hrefhttp://www.arisoniraq.com/ stylecolor: #ffffff>www.arisoniraq.com/a> /p> /li> /ul> /div> /div> div classcol-lg-4 col-md-12 col-sm-12 info-column wow fadeInUp data-wow-delay00ms data-wow-duration1500ms style visibility: visible; animation-duration: 1500ms; animation-delay: 0ms; animation-name: fadeInUp; > div classinfo-inner> h3 stylecolor: #ffffff>ARISON ITALIA SRL, ITALIA /h3> ul classinfo-list clearfix> li> i classfas fa-map-marker-alt>/i> h5 stylecolor: #ffffff>Office Location/h5> p stylecolor: #ffffff> Address: i classflag flag-it>/i> Via Ss. Trinita 3 br> 41121 Modena - Italia !-- P.O.Box: 59/0239 Erbil --> /p> /li> li> i classfas fa-envelope-open>/i> h5 stylecolor: #ffffff>Email Us/h5> p stylecolor: #ffffff>a stylecolor: #ffffff hrefmailto:info@arisonitalia.com>info@arisonitalia.com/a>/p> /li> !-- li> i classfas fa-phone>/i> h5>Call Us/h5> p> Phone: a hreftel:+97125554144>+ 971 (2) 555 41 44/a> br /> Fax: a hreftel:+97125554146>+ 971 (2) 555 41 46/a> /p> /li> --> li> i classfas fa-globe>/i> h5 stylecolor: #ffffff>Visit Our Website/h5> p stylecolor: #ffffff> a hrefhttps://www.arisonitalia.com/ stylecolor: #ffffff>www.arisonitalia.com/a> /p> /li> /ul> /div> /div> /div> /div> /section> !-- branches-showrooms end --> !-- contact --> section idcontact classcontact-style-two style background: linear-gradient( to bottom, white, var(--var-color-white-blue) ); padding: 120px 0; > div classauto-container> div classtitle-text wow fadeInUp data-wow-delay00ms data-wow-duration1500ms style visibility: visible; animation-duration: 1500ms; animation-delay: 0ms; animation-name: fadeInUp; > h2 styletext-align: center; margin-bottom: 80px>Contact Us/h2> /div> div classrow clearfix> div classcol-lg-5 col-md-12 col-sm-12 info-column> div classinfo-inner> div classshape stylebackground-image: url(assets/imgs/shape/shape-42.png)>/div> !-- h3>Contact Info/h3> --> ul classinfo-list clearfix wow fadeInUp data-wow-delay00ms data-wow-duration1500ms style visibility: visible; animation-duration: 1500ms; animation-delay: 0ms; animation-name: fadeInUp; > li> i classfas fa-map-marker-alt>/i> h5>Head Office Location/h5> p>Verdun, Unesco Square, br> Kojok Bldg., 8th Floor, br> Beirut - Lebanon/p> /li> li> i classfas fa-envelope-open>/i> h5>Email Us/h5> p> a hrefmailto:arison@arison.com.lb>arison@arison.com.lb/a> /p> /li> li> i classfas fa-phone>/i> h5>Call Us/h5> p> Tel: a hreftel:+9611864824>+961 1 864 824/a> br /> Mobile: a hreftel:+9613755266>+961 3 755 266/a> br /> Fax: a hreftel:+9611864732>+961 1 864 732/a> /p> /li> /ul> /div> /div> div classcol-lg-7 col-md-12 col-sm-12 form-column> div classform-inner> !-- h3>Send us an E-mail/h3> --> form methodpost actioncontact.php idcontact-form classdefault-form wow fadeInUp data-wow-delay00ms data-wow-duration1500ms style visibility: visible; animation-duration: 1500ms; animation-delay: 0ms; animation-name: fadeInUp; > div classrow clearfix> div classcol-lg-6 col-md-6 col-sm-12 form-group> input typetext namename placeholderFull Name required /> /div> div classcol-lg-6 col-md-6 col-sm-12 form-group> input typeemail nameemail placeholderEmail Address required /> /div> div classcol-lg-6 col-md-12 col-sm-12 form-group> input typetext namephone required placeholderPhone Number /> /div> div classcol-lg-6 col-md-12 col-sm-12 form-group> input typetext namesubject required placeholderSubject /> /div> div classcol-lg-12 col-md-12 col-sm-12 form-group> textarea namemessage placeholderMessage>/textarea> /div> div classcol-lg-12 col-md-12 col-sm-12 form-group message-btn> button classtheme-btn btn-one typesubmit namesubmit-form> Send i classfas fa-paper-plane>/i> /button> /div> /div> /form> /div> /div> /div> /div> /section> !-- contact end --> !-- map --> !-- iframe classwow fadeInUp srchttps://www.google.com/maps/embed?pb!1m18!1m12!1m3!1d3312.294853490894!2d35.48241881551715!3d33.882059334126055!2m3!1f0!2f0!3f0!3m2!1i1024!2i768!4f13.1!3m3!1m2!1s0x151f1736b1159bf9%3A0x7187ce4186afa2c2!2sArison%20SARL!5e0!3m2!1sen!2slb!4v1657614864294!5m2!1sen!2slb width100% height500 styleborder:0; allowfullscreen loadinglazy referrerpolicyno-referrer-when-downgrade>/iframe> --> !-- iframe classwow fadeInUp srchttps://www.google.com/maps/d/embed?mid1xWUx6AZvJzsP9WwmZP6kq1Iiz3iGAng&ehbc2E312F width100% height500>/iframe> --> iframe classwow fadeInUp srchttps://www.google.com/maps/d/u/0/embed?mid1FrSHiTcpb23QZ9MRe2JR7lC1WZX_cWs&ehbc2E312F&noprof1 width100% height550>/iframe> !-- map end --> !-- Footer Start --> !-- main-footer -->footer classmain-footer> div classfooter-bottom> div classauto-container> div classbottom-inner> span stylecolor: white classcopyright> Copyright © script> document.querySelector(.copyright).innerHTML + new Date().getFullYear(); /script> — ARISON. Powered by a hrefhttps://microbits.co/>Microbits/a>. /span> ul classsocial-links clearfix> li> a target_blank hrefhttps://www.facebook.com/ArisonLebanon/>i classfab fa-facebook-f>/i>/a> /li> !-- li>a href>i classfab fa-twitter>/i>/a>/li> --> li> a target_blank hrefhttps://www.instagram.com/arison_lb/?hlen>i classfab fa-instagram>/i>/a> /li> li> a target_blank hrefhttps://www.linkedin.com/company/abdul-razzak-itani-&-sons-arison-/?original_refererhttps%3A%2F%2Fwww%2Egoogle%2Ecom%2F&originalSubdomainlb>i classfab fa-linkedin-in>/i>/a> /li> /ul> !-- ul classfooter-nav clearfix> li>a href#>#/a>/li> li>a href#>#/a>/li> /ul> --> /div> /div> /div>/footer>!-- main-footer end --> !-- Footer End --> !--Scroll to top--> a href#home>button classscroll-top scroll-to-target stylebackground-color: gray;> span classfal fa-angle-up>/span> /a> /button> !-- Modals --> div classmodal fade idwater-34 tabindex-1 roledialog aria-labelledbywater-34-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/rehabilitation-daychounieh/1.jpg altRehabilitation of Daychounieh Pumping Station, Construction and Equipping of New Pumping Room /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/rehabilitation-daychounieh/2.jpg altRehabilitation of Daychounieh Pumping Station, Construction and Equipping of New Pumping Room /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/rehabilitation-daychounieh/3.jpg altRehabilitation of Daychounieh Pumping Station, Construction and Equipping of New Pumping Room /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/rehabilitation-daychounieh/4.jpg altRehabilitation of Daychounieh Pumping Station, Construction and Equipping of New Pumping Room /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/rehabilitation-daychounieh/5.jpg altRehabilitation of Daychounieh Pumping Station, Construction and Equipping of New Pumping Room /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/rehabilitation-daychounieh/6.jpg altRehabilitation of Daychounieh Pumping Station, Construction and Equipping of New Pumping Room /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/rehabilitation-daychounieh/7.jpg altRehabilitation of Daychounieh Pumping Station, Construction and Equipping of New Pumping Room /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/rehabilitation-daychounieh/8.jpg altRehabilitation of Daychounieh Pumping Station, Construction and Equipping of New Pumping Room /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Rehabilitation of Daychounieh Pumping Station, Construction and Equipping of New Pumping Room /h3> div classlocation>Daychounieh, Metn - Lebanon/div> div classdate>2024/div> div classdescriptions>Upgrading of existing pump station in Daychounieh that provides potable water for residents in the region of Mount Lebanon including a 42 kW sump pumpset, 1x 475 kW submersible pumpset installed in a booster can, rehabilitation of existing anti-water hammer system, ATS, PLC, piping, hydraulic accessories, instrumentation & control accessories./div> /div> /div> /div> /div> /div> div classmodal fade idwater-1 tabindex-1 roledialog aria-labelledbywater-1-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/aramoun-project-zone-c/1.jpg altConstruction of Aramoun Sud Bas Booster Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/aramoun-project-zone-c/2.jpg altConstruction of Aramoun Sud Bas Booster Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/aramoun-project-zone-c/3.jpg altConstruction of Aramoun Sud Bas Booster Pumping Station /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Construction of Aramoun Sud Bas Booster Pumping Station/h3> div classlocation>Aramoun, Aley - Lebanon/div> div classdate>2017 - 2018/div> div classdescriptions>Construction of a booster pump station for b> Greater Beirut Water Supply Project - Zone C /b> that provides potable water from Litani and Awali rivers to the residents of Greater Beirut region including 2x 37 kW booster pumpsets, anti-water hammer system, gas injection chlorination system, 80 KVA stand-by generator, piping, hydraulic accessories, instrumentation & control accessories and monorail hoist with electrical crane./div> /div> /div> /div> /div> /div> div classmodal fade idwater-2 tabindex-1 roledialog aria-labelledbywater-2-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/naameh-project-zone-c/1.jpg altConstruction of Naameh Nord Bas Booster Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/naameh-project-zone-c/2.jpg altConstruction of Naameh Nord Bas Booster Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/naameh-project-zone-c/3.jpg altConstruction of Naameh Nord Bas Booster Pumping Station /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Construction of Naameh Nord Bas Booster Pumping Station/h3> div classlocation>Naameh, Chouf - Lebanon/div> div classdate>2017 - 2018/div> div classdescriptions>Construction of booster pumping station for Greater Beirut Water Supply Project -Zone C that provides potable water from Litani and Awali rivers to the residents of Greater Beirut region including 2x 37 kW booster pumpsets, anti-water hammer system, gas injection chlorination system, 80 KVA stand-by generator, piping, hydraulic accessories, instrumentation & control accessories and monorail hoist with electrical crane./div> /div> /div> /div> /div> /div> div classmodal fade idwater-3 tabindex-1 roledialog aria-labelledbywater-3-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/khaldeh-project-zone-c/1.jpg altConstruction of Khalde Bas Booster Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/khaldeh-project-zone-c/2.jpg altConstruction of Khalde Bas Booster Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/khaldeh-project-zone-c/3.jpg altConstruction of Khalde Bas Booster Pumping Station /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Construction of Khalde Bas Booster Pumping Station/h3> div classlocation>Khaldah - Lebanon/div> div classdate>2017 - 2018/div> div classdescriptions>Construction of booster pumping station for Greater Beirut Water Supply Project -Zone C that provides potable water from Litani and Awali rivers to the residents of Greater Beirut region including 2x 160 kW booster pumpsets, anti-water hammer system, gas injection chlorination system, 350 KVA stand-by generator, piping, hydraulic accessories, instrumentation & control accessories and monorail hoist with electrical crane./div> /div> /div> /div> /div> /div> div classmodal fade idwater-4 tabindex-1 roledialog aria-labelledbywater-4-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/qobbe-project-zone-c/1.jpg altConstruction of Qobbe Bas 1 - Qobbe Haut Booster Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/qobbe-project-zone-c/2.jpg altConstruction of Qobbe Bas 1 - Qobbe Haut Booster Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/qobbe-project-zone-c/3.jpg altConstruction of Qobbe Bas 1 - Qobbe Haut Booster Pumping Station /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Construction of Qobbe Bas 1 - Qobbe Haut Booster Pumping Station /h3> div classlocation>Aramoun, Aley - Lebanon/div> div classdate>2017 - 2018/div> div classdescriptions>Construction of booster pumping station for Greater Beirut Water Supply Project -Zone C that provides potable water from Litani and Awali rivers to the residents of Greater Beirut region including 2x 75 kW booster pumpsets, anti-water hammer system, gas injection chlorination system, 160KVA stand-by generator, piping, hydraulic accessories, instrumentation & control accessories and monorail hoist with electrical crane./div> /div> /div> /div> /div> /div> div classmodal fade idwater-5 tabindex-1 roledialog aria-labelledbywater-5-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/qobbe-project-zone-c/2.jpg altConstruction of Qobbe Bas 2 - Oumara Booster Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/qobbe-project-zone-c/1.jpg altConstruction of Qobbe Bas 2 - Oumara Booster Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/qobbe-project-zone-c/3.jpg altConstruction of Qobbe Bas 2 - Oumara Booster Pumping Station /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Construction of Qobbe Bas 2 - Oumara Booster Pumping Station/h3> div classlocation>Aramoun, Aley - Lebanon/div> div classdate>2017 - 2018/div> div classdescriptions>Construction of booster pumping station for Greater Beirut Water Supply Project -Zone C that provides potable water from Litani and Awali rivers to the residents of Greater Beirut region including 2x 200 kW booster pumpsets, anti-water hammer system, gas injection chlorination system, 400 KVA stand-by generator, piping, hydraulic accessories, instrumentation & control accessories and monorail hoist with electrical crane./div> /div> /div> /div> /div> /div> div classmodal fade idwater-6 tabindex-1 roledialog aria-labelledbywater-6-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/choueifat-bp-station-zone-c/1.jpg altConstruction of Choueifat Bas Booster Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/choueifat-bp-station-zone-c/2.jpg altConstruction of Choueifat Bas Booster Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/choueifat-bp-station-zone-c/3.jpg altConstruction of Choueifat Bas Booster Pumping Station /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Construction of Choueifat Bas Booster Pumping Station/h3> div classlocation>Choueifat, Aley - Lebanon/div> div classdate>2017 - 2018/div> div classdescriptions>Construction of booster pumping station for Greater Beirut Water Supply Project -Zone C that provides potable water from Litani and Awali rivers to the residents of Greater Beirut region including 2x 200 kW booster pumpsets, anti-water hammer system, gas injection chlorination system, 600 KVA stand-by generator, piping, hydraulic accessories, instrumentation & control accessories and monorail hoist with electrical crane./div> /div> /div> /div> /div> /div> div classmodal fade idwater-7 tabindex-1 roledialog aria-labelledbywater-7-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/kfarchima-bp-station-zone-c/1.jpg altConstruction of Kfarchima Bas Booster Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/kfarchima-bp-station-zone-c/2.jpg altConstruction of Kfarchima Bas Booster Pumping Station /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Construction of Kfarchima Bas Booster Pumping Station/h3> div classlocation>Kfarchima, Baabda - Lebanon/div> div classdate>2017-2018/div> div classdescriptions> Construction of booster pumping station for Greater Beirut Water Supply Project -Zone C that provides potable water from Litani and Awali rivers to the residents of Greater Beirut region including 2x 132 kW booster pumpsets, anti-water hammer system, gas injection chlorination system, 600 KVA stand-by generator, piping, hydraulic accessories, instrumentation & control accessories and monorail hoist with electrical crane./div> /div> /div> /div> /div> /div> div classmodal fade idwater-8 tabindex-1 roledialog aria-labelledbywater-8-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/kfarchima-bp-station-zone-c/2.jpg altConstruction of Kfarchima Haut Booster Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/kfarchima-bp-station-zone-c/1.jpg altConstruction of Kfarchima Haut Booster Pumping Station /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Construction of Kfarchima Haut Booster Pumping Station/h3> div classlocation>Kfarchima, Baabda - Lebanon/div> div classdate>2017-2018/div> div classdescriptions>Construction of booster pumping station for Greater Beirut Water Supply Project -Zone C that provides potable water from Litani and Awali rivers to the residents of Greater Beirut region including 2x 75 kW booster pumpsets, anti-water hammer system, gas injection chlorination system, 160 KVA stand-by generator, piping, hydraulic accessories, instrumentation & control accessories and monorail hoist with electrical crane./div> /div> /div> /div> /div> /div> div classmodal fade idwater-9 tabindex-1 roledialog aria-labelledbywater-9-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/cap-sur-ville/1.jpg altConstruction of Cap Sur Ville Booster Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/cap-sur-ville/2.jpg altConstruction of Cap Sur Ville Booster Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/cap-sur-ville/3.jpg altConstruction of Cap Sur Ville Booster Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/cap-sur-ville/4.jpg altConstruction of Cap Sur Ville Booster Pumping Station /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Construction of Cap Sur Ville Booster Pumping Station/h3> div classlocation>Dekwaneh, Matn - Lebanon/div> div classdate>2017-2018/div> div classdescriptions>Construction of booster pumping station for Greater Beirut Water Supply Project -Zone D that provides potable water from Litani and Awali rivers to the residents of Greater Beirut region including 2x 110 kW booster pumpsets, anti-water hammer system, gas injection chlorination system, 600 KVA stand-by generator, piping, hydraulic accessories, instrumentation & control accessories and monorail hoist with electrical crane./div> /div> /div> /div> /div> /div> div classmodal fade idwater-10 tabindex-1 roledialog aria-labelledbywater-10-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/el-aamariye-project/1.jpg altConstruction of El-Aamriye (Fanar Bas) Booster Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/el-aamariye-project/2.jpg altConstruction of El-Aamriye (Fanar Bas) Booster Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/el-aamariye-project/3.jpg altConstruction of El-Aamriye (Fanar Bas) Booster Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/el-aamariye-project/4.jpg altConstruction of El-Aamriye (Fanar Bas) Booster Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/el-aamariye-project/5.jpg altConstruction of El-Aamriye (Fanar Bas) Booster Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/el-aamariye-project/6.jpg altConstruction of El-Aamriye (Fanar Bas) Booster Pumping Station /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Construction of El-Aamriye (Fanar Bas) Booster Pumping Station/h3> div classlocation>Al Fanar, Matn - Lebanon/div> div classdate>2017-2018/div> div classdescriptions>Construction of booster pumping station for Greater Beirut Water Supply Project -Zone D that provides potable water from Litani and Awali rivers to the residents of Greater Beirut region including 2x 200 kW booster pumpsets, anti-water hammer system, gas injection chlorination system, 600 KVA stand-by generator, piping, hydraulic accessories, instrumentation & control accessories and monorail hoist with electrical crane, piping, hydraulic accessories, instrumentation & control accessories and monorail hoist with electrical crane./div> /div> /div> /div> /div> /div> div classmodal fade idwater-11 tabindex-1 roledialog aria-labelledbywater-11-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/ain-al-asaad-project/1.jpg altEquipping of Pumping Station in Ain El Asaad /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/ain-al-asaad-project/2.jpg altEquipping of Pumping Station in Ain El Asaad /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/ain-al-asaad-project/3.jpg altEquipping of Pumping Station in Ain El Asaad /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/ain-al-asaad-project/4.jpg altEquipping of Pumping Station in Ain El Asaad /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Equipping of Pumping Station in Ain El Asaad/h3> div classlocation>Ain El Asaad, Chouf - Lebanon/div> div classdate>2019/div> div classdescriptions>Equipping the pump station with 51kW submersible pumpset (borehole), gas chlorination system, 1 km pipeline, hydraulic accessories, instrumentation & control accessories, ATS, starter control panels and PLC system./div> /div> /div> /div> /div> /div> div classmodal fade idwater-12 tabindex-1 roledialog aria-labelledbywater-12-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/darya-villages/1.jpg altEquipping of Pumping Station in Darya Villages /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/darya-villages/2.jpg altEquipping of Pumping Station in Darya Villages /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Equipping of Pumping Station in Darya Villages/h3> div classlocation>Darya, Batroun - Lebanon/div> div classdate>2019/div> div classdescriptions>Equipping the pump station with 110 kW submersible pumpset (borehole), 110 kW horizontal booster pumpset, gas chlorination system, 4 km pipeline, anti-water hammer system, power transformer, hydraulic accessories, instrumentation & control accessories, ATS, starter control panels and PLC system/div> /div> /div> /div> /div> /div> div classmodal fade idwater-13 tabindex-1 roledialog aria-labelledbywater-13-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/jradeh-station-project/1.jpg altRehabilitation of Jradeh Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/jradeh-station-project/2.jpg altRehabilitation of Jradeh Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/jradeh-station-project/3.jpg altRehabilitation of Jradeh Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/jradeh-station-project/4.jpg altRehabilitation of Jradeh Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/jradeh-station-project/5.jpg altRehabilitation of Jradeh Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/jradeh-station-project/6.jpg altRehabilitation of Jradeh Pumping Station /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Rehabilitation of Jradeh Pumping Station/h3> div classlocation>Chekka, Koura - Lebanon/div> div classdate>2020-2021/div> div classdescriptions>Rehabilitation works for Jradeh Pumping Station including the installlation 5x 26 kW submersible pumps in 5 wells, 7x 150 kW submersible booster pumps (installed in barrels), hydraulic accessories, instrumentation & control accessories, anti-water hammer system, gas injection chlorination system, MDB, starter control panels, ATS, PLC and HMI systems./div> /div> /div> /div> /div> /div> div classmodal fade idwater-14 tabindex-1 roledialog aria-labelledbywater-14-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/joun-barja-reservoirs/1.jpg altConstruction of Two Reservoirs (Joun and Barja) and Rehabilitation of One Spring (Ein El Delbeh) /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/joun-barja-reservoirs/2.jpg altConstruction of Two Reservoirs (Joun and Barja) and Rehabilitation of One Spring (Ein El Delbeh) /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Construction of Two Reservoirs (Joun and Barja) and Rehabilitation of One Spring (Ein El Delbeh)/h3> div classlocation>Joun, Barja; Chouf - Lebanon/div> div classdate>2019-2020/div> div classdescriptions>Construction of 2x water concrete reservoirs with a capacity of 1000 m3 each in Barja & Joun towns in addition to rehabilitation works for Ein El Delbeh spring within in Mount Lebanon region./div> /div> /div> /div> /div> /div> div classmodal fade idwater-15 tabindex-1 roledialog aria-labelledbywater-15-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/houmal-wp-station/1.jpg altEquipping of Houmal’s Well and Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/houmal-wp-station/2.jpg altEquipping of Houmal’s Well and Pumping Station /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Equipping of Houmal’s Well and Pumping Station/h3> div classlocation>Houmal, Aley - Lebanon/div> div classdate>2021/div> div classdescriptions>Construction of pumping station including 90 kW submersible pumpset, 700 m pipeline, gas injection chlorination system, anti-water hammer, stand-by generator, ATS, starter control panel and PLC system./div> /div> /div> /div> /div> /div> div classmodal fade idwater-16 tabindex-1 roledialog aria-labelledbywater-16-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/tallet-el-khayat/1.jpg altRehabilitation of Tallet El Khayyat Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/tallet-el-khayat/2.jpg altRehabilitation of Tallet El Khayyat Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/tallet-el-khayat/3.jpg altRehabilitation of Tallet El Khayyat Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/tallet-el-khayat/4.jpg altRehabilitation of Tallet El Khayyat Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/tallet-el-khayat/5.jpg altRehabilitation of Tallet El Khayyat Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/tallet-el-khayat/6.jpg altRehabilitation of Tallet El Khayyat Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/tallet-el-khayat/7.jpg altRehabilitation of Tallet El Khayyat Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/tallet-el-khayat/8.jpg altRehabilitation of Tallet El Khayyat Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/tallet-el-khayat/9.jpg altRehabilitation of Tallet El Khayyat Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/tallet-el-khayat/10.jpg altRehabilitation of Tallet El Khayyat Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/tallet-el-khayat/11.jpg altRehabilitation of Tallet El Khayyat Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/tallet-el-khayat/12.jpg altRehabilitation of Tallet El Khayyat Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/tallet-el-khayat/13.jpg altRehabilitation of Tallet El Khayyat Pumping Station /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Rehabilitation of Tallet El Khayyat Pumping Station/h3> div classlocation>Beirut - Lebanon/div> div classdate>2022-2023/div> div classdescriptions>Upgrading of Tallet El Khayat pump station which supplies domestic water to major regions of Beirut city including 4x 110 kW horizontal booster pumpsets, hydraulic accessories, ATS and VFD starter panels./div> /div> /div> /div> /div> /div> div classmodal fade idwater-17 tabindex-1 roledialog aria-labelledbywater-17-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/nahr-el-kaleb/1.jpg altEquipping of Nahr El Kaleb Boreholes /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/nahr-el-kaleb/2.jpg altEquipping of Nahr El Kaleb Boreholes /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/nahr-el-kaleb/3.jpg altEquipping of Nahr El Kaleb Boreholes /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Equipping of Nahr El Kaleb Boreholes/h3> div classlocation>Zouk Mosbeh, Keserwan - Lebanon/div> div classdate>2022-2023/div> div classdescriptions>Equipping 3x boreholes in Naher El Kaleb region in Mount Lebanon province including well cleaning and well analysis (CCTV Inspection) 3x 30 kW submersible pumpsets, VFD starter panels, 500KVA stand-by generator and ATS./div> /div> /div> /div> /div> /div> div classmodal fade idwater-18 tabindex-1 roledialog aria-labelledbywater-18-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/dbayeh-pumping-station/1.jpg altRehabilitation of Dbayeh Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/dbayeh-pumping-station/2.jpg altRehabilitation of Dbayeh Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/dbayeh-pumping-station/3.jpg altRehabilitation of Dbayeh Pumping Station /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Rehabilitation of Dbayeh Pumping Station/h3> div classlocation>Dbayeh, Metn - Lebanon/div> div classdate>2022-2023/div> div classdescriptions>Upgrading Dbayeh pump station including double suction split case pumpsets (800 kW and 630 kW), SCADA system, VFD starter control panels and ATS./div> /div> /div> /div> /div> /div> div classmodal fade idwater-19 tabindex-1 roledialog aria-labelledbywater-19-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/qalaat-project/1.jpg altConstruction of Electro-mechnical System and PV Solar System for Qalhat Elevated Reservoir /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/qalaat-project/1.jpg altConstruction of Electro-mechnical System and PV Solar System for Qalhat Elevated Reservoir /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Construction of Electro-mechnical System and PV Solar System for Qalhat Elevated Reservoir/h3> div classlocation>Qalhat, Koura - Lebanon/div> div classdate>2021-2022/div> div classdescriptions>Construction of 200 m3 concrete Elevated Reservoir, including vertical pumpset, hybrid PV solar system to operate the pumpset, VFD starter control panel and ATS./div> /div> /div> /div> /div> /div> div classmodal fade idwater-20 tabindex-1 roledialog aria-labelledbywater-20-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/rachaaine-rahbe-bazoun/1.jpg altUpgrade of Potable Water Facilities in Rachaaine, Rahbe and Bazoun villages for the North Lebanon Water Establishment (NLWE) /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/rachaaine-rahbe-bazoun/2.jpg altUpgrade of Potable Water Facilities in Rachaaine, Rahbe and Bazoun villages for the North Lebanon Water Establishment (NLWE) /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/rachaaine-rahbe-bazoun/3.jpg altUpgrade of Potable Water Facilities in Rachaaine, Rahbe and Bazoun villages for the North Lebanon Water Establishment (NLWE) /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Upgrade of Potable Water Facilities in Rachaaine, Rahbe and Bazoun villages for the North Lebanon Water Establishment (NLWE)/h3> div classlocation>(Rachaaine, Zgharta; Rahbe, Akkar; Bazoun, Bsharre) - Lebanon/div> div classdate>2021-2022/div> div classdescriptions>Construction of 3 water pump stations including 65 m3, 150 m3 and 200 m3 water tanks, submersible pumpsets, horizontal booster pumpsets, gas injection chlorination systems, 2 km pipe line, 3x stand-by generator sets (60, 100 and 250 KVA), PLC system and ATS./div> /div> /div> /div> /div> /div> div classmodal fade idwater-21 tabindex-1 roledialog aria-labelledbywater-21-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/mansourieh-wp-station/1.jpg altConstruction of Mansourieh Water Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/mansourieh-wp-station/2.jpg altConstruction of Mansourieh Water Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/mansourieh-wp-station/3.jpg altConstruction of Mansourieh Water Pumping Station /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Construction of Mansourieh Water Pumping Station/h3> div classlocation>Mansourieh, Metn - Lebanon/div> div classdate>2016-2017/div> div classdescriptions>Construction of pump station that delivers potable water to more than 7 villages including 4 booster pumpsets (2x 132 kW and 2x 200 kW), anti water hammer system, MCC and MDB panels./div> /div> /div> /div> /div> /div> div classmodal fade idwater-22 tabindex-1 roledialog aria-labelledbywater-22-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/wazzaneh-wp-station/1.jpg altConstruction of Wazzaneh Water Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/wazzaneh-wp-station/2.jpg altConstruction of Wazzaneh Water Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/wazzaneh-wp-station/3.jpg altConstruction of Wazzaneh Water Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/wazzaneh-wp-station/4.jpg altConstruction of Wazzaneh Water Pumping Station /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Construction of Wazzaneh Water Pumping Station/h3> div classlocation>Wazzaneh, Hasbaya - Lebanon/div> div classdate>2005/div> div classdescriptions>Construction of 2 pumping stations that pump water from Wazzanehs spring to 30 villages in Southern Lebanon including 7x 250kW booster pumpsets, SCADA system, soft starter panels, ATS, anti-water hammer system, and PLC./div> /div> /div> /div> /div> /div> div classmodal fade idwater-23 tabindex-1 roledialog aria-labelledbywater-23-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/batoulay-wp-station/1.jpg altConstruction of Batoulay Water Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/batoulay-wp-station/2.jpg altConstruction of Batoulay Water Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/batoulay-wp-station/3.jpg altConstruction of Batoulay Water Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/batoulay-wp-station/4.jpg altConstruction of Batoulay Water Pumping Station /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Construction of Batoulay Water Pumping Station/h3> div classlocation>Batoulay, Tyre - Lebanon/div> div classdate>2006-2007/div> div classdescriptions>Construction of pump station that pumps water to more than 12 villages in Southern Lebanon including 6x 170 kW submersible pumpsets, 10x 250 kW horizontal booster pumpsets, SCADA system, soft starter panels, ATS, and anti-water hammer system./div> /div> /div> /div> /div> /div> div classmodal fade idwater-24 tabindex-1 roledialog aria-labelledbywater-24-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/aya-tower/1.jpg altSupply and Installation for Aya Tower /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/aya-tower/2.jpg altSupply and Installation for Aya Tower /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/aya-tower/3.jpg altSupply and Installation for Aya Tower /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/aya-tower/4.jpg altSupply and Installation for Aya Tower /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Supply and Installation for Aya Tower/h3> div classlocation>Gemayze, Beirut - Lebanon/div> div classdate>2018/div> div classdescriptions>Supply of 7 packaged VFD operated booster sets (1.1 to 18.5 kW), EN12845 fire fighting unit and 12 circulating pumpsets (1.1, 2.0.3.0 and 4.0 kW) consisting of control panels, pressure tanks, and protection devices./div> /div> /div> /div> /div> /div> div classmodal fade idwater-25 tabindex-1 roledialog aria-labelledbywater-25-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/nerve-disease-hospital/1.jpg altSupply and Installation of EN12845 Fire Fighting Unit for Nerve Disease Hospital /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/nerve-disease-hospital/1.jpg altSupply and Installation of EN12845 Fire Fighting Unit for Nerve Disease Hospital /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Supply and Installation of EN12845 Fire Fighting Unit for Nerve Disease Hospital/h3> div classlocation>Khaldah - Lebanon/div> div classdate>2014/div> div classdescriptions>Supply of a fire fighting unit consisting of EN12845 fire fighting unit equipped with vertical pumpsets, fire rated control panel and jockey pump./div> /div> /div> /div> /div> /div> div classmodal fade idwater-26 tabindex-1 roledialog aria-labelledbywater-26-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/aswak-beirut/1.jpg altSupply and Installation of NFPA20 Fire Fighting Unit and Booster Set in Aswak Beirut /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/aswak-beirut/2.jpg altSupply and Installation of NFPA20 Fire Fighting Unit and Booster Set in Aswak Beirut /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Supply and Installation of NFPA20 Fire Fighting Unit and Booster Set in Aswak Beirut/h3> div classlocation>Downtown, Beirut - Lebanon/div> div classdate>2017/div> div classdescriptions>Supply and installation of a fire fighting unit consisting of NFPA20 fire fighting unit equipped with split case pumpsets, fire rated control panel, jockey pump and VFD operated packaged booster pumpset./div> /div> /div> /div> /div> /div> div classmodal fade idwater-27 tabindex-1 roledialog aria-labelledbywater-27-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/pump-series-for-ro-plant/1.jpg altSupply and Installation Vertical Pumps in Series /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/pump-series-for-ro-plant/1.jpg altSupply and Installation Vertical Pumps in Series /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Supply and Installation Vertical Pumps in Series/h3> div classlocation>Tarik Jdide, Beirut - Lebanon/div> div classdate>2017/div> div classdescriptions>Supply and installation of 2 vertical stainless steel pumpsets especially designed to be connected in series and deliver 17 m3/h at 400 m for an existing RO system./div> /div> /div> /div> /div> /div> div classmodal fade idwater-28 tabindex-1 roledialog aria-labelledbywater-28-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/hasbaya-hospital/1.jpg altSupply and Installation of Booster Pumpsets for Hasbaya Hospital /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/hasbaya-hospital/1.jpg altSupply and Installation of Booster Pumpsets for Hasbaya Hospital /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Supply and Installation of Booster Pumpsets for Hasbaya Hospital/h3> div classlocation>Hasbaya - Lebanon/div> div classdate>2015/div> div classdescriptions>Supply and installation of 4 booster pumpsets./div> /div> /div> /div> /div> /div> div classmodal fade idwater-29 tabindex-1 roledialog aria-labelledbywater-29-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/b11/1.jpg altSupply and Installation for B11 /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/b11/2.jpg altSupply and Installation for B11 /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/b11/3.jpg altSupply and Installation for B11 /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/b11/4.jpg altSupply and Installation for B11 /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Supply and Installation for B11/h3> div classlocation>Minet El Hosn, Beirut - Lebanon/div> div classdate>2017/div> div classdescriptions>Supply of 11 packaged VFD operated booster sets (1.1 to 11.0 kW), EN12845 fire fighting unit, 6 sump pumps (5.5 and 11 kW) and 2x 7.5 kW booster pumpsets consisting of control panels, pressure tanks, and protection devices./div> /div> /div> /div> /div> /div> div classmodal fade idwater-30 tabindex-1 roledialog aria-labelledbywater-30-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/itco-fire/1.jpg altSupply and Installation of Fire Fighting Unit for ITCO /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/itco-fire/1.jpg altSupply and Installation of Fire Fighting Unit for ITCO /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Supply and Installation of Fire Fighting Unit for ITCO/h3> div classlocation>Tripoli - Lebanon/div> div classdate>2019/div> div classdescriptions>Supply of a fire fighting unit (Locally assembeled and tested at Arison Industrial Plant) consisting of 2x 45kW booster pumpsets, control panel and jockey pump./div> /div> /div> /div> /div> /div> div classmodal fade idwater-31 tabindex-1 roledialog aria-labelledbywater-31-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/private-project/1.jpg altSupply and Installation of Packaged Booster Sets /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/private-project/1.jpg altSupply and Installation of Packaged Booster Sets /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Supply and Installation of Packaged Booster Sets/h3> div classlocation>Ain Mrayseh, Beirut - Lebanon/div> div classdate>2016/div> div classdescriptions>Supply of 3 packaged booster units including DOL starter panel, pressure switches, and pressure tanks./div> /div> /div> /div> /div> /div> div classmodal fade idwater-32 tabindex-1 roledialog aria-labelledbywater-32-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/sadco/1.jpg altSupply and Installation of Sewage Pumps for SADCO Warehouse /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/sadco/2.jpg altSupply and Installation of Sewage Pumps for SADCO Warehouse /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Supply and Installation of Sewage Pumps for SADCO Warehouse/h3> div classlocation>Jnah, Beirut - Lebanon/div> div classdate>2017/div> div classdescriptions>Supply and installation of 2 sewage pumps including DOL starter panel with alarm, float switches and PVC fittings and valves./div> /div> /div> /div> /div> /div> div classmodal fade idwater-33 tabindex-1 roledialog aria-labelledbywater-33-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/pepsi-factory/1.jpg altSupply and Installation of Booster Pumpset for Pepsi Cola Factory /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/water/pepsi-factory/1.jpg altSupply and Installation of Booster Pumpset for Pepsi Cola Factory /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Supply and Installation of Booster Pumpset for Pepsi Cola Factory/h3> div classlocation>Choueifat - Lebanon/div> div classdate>2018/div> div classdescriptions>Supply and installation of booster pumpset for chillers./div> /div> /div> /div> /div> /div> div classmodal fade idtreatment-plant-1 tabindex-1 roledialog aria-labelledbytreatment-plant-1-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/amidy-project/1.jpg altDesign, Build and Operate of Amidy Water Project /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/amidy-project/2.jpg altDesign, Build and Operate of Amidy Water Project /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/amidy-project/3.jpg altDesign, Build and Operate of Amidy Water Project /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/amidy-project/4.jpg altDesign, Build and Operate of Amidy Water Project /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/amidy-project/5.jpg altDesign, Build and Operate of Amidy Water Project /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/amidy-project/6.jpg altDesign, Build and Operate of Amidy Water Project /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/amidy-project/7.jpg altDesign, Build and Operate of Amidy Water Project /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/amidy-project/8.jpg altDesign, Build and Operate of Amidy Water Project /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/amidy-project/9.jpg altDesign, Build and Operate of Amidy Water Project /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/amidy-project/10.jpg altDesign, Build and Operate of Amidy Water Project /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Design, Build and Operate of Amidy Water Project/h3> div classlocation>Amidy, Duhok, Kurdistan - Iraq/div> div classdate>2011-2018/div> div classdescriptions>Construction of a water treatment plant having a capacity of 2400 m3/hr including low lift pumping station, hight lift pumping station, 3 booster stations, reservoirs, 8 sand filters, 4 clarifiers, 126 km of transmission and distribution lines, 6 MW power plants, 47 km of overhead transmission lines, SCADA system and 2 years operation and maintenance service./div> /div> /div> /div> /div> /div> div classmodal fade idtreatment-plant-2 tabindex-1 roledialog aria-labelledbytreatment-plant-2-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/hadath/1.jpg altConstruction of a Hadath Desalination Plant /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/hadath/2.jpg altConstruction of a Hadath Desalination Plant /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/hadath/3.jpg altConstruction of a Hadath Desalination Plant /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/hadath/4.jpg altConstruction of a Hadath Desalination Plant /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/hadath/5.jpg altConstruction of a Hadath Desalination Plant /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/hadath/6.jpg altConstruction of a Hadath Desalination Plant /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Construction of a Hadath Desalination Plant/h3> div classlocation>Hadath, Baabda - Lebanon/div> div classdate>2018-2020/div> div classdescriptions>/div> /div> /div> /div> /div> /div> div classmodal fade idtreatment-plant-3 tabindex-1 roledialog aria-labelledbytreatment-plant-3-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/zahle-project/1.jpg altEquipping of 3 Wells in Zahle Region and Electro-mechanical Rehabilitation Works for Zahle Intermediate Reservoir, Water Treatment Plant and Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/zahle-project/2.jpg altEquipping of 3 Wells in Zahle Region and Electro-mechanical Rehabilitation Works for Zahle Intermediate Reservoir, Water Treatment Plant and Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/zahle-project/3.jpg altEquipping of 3 Wells in Zahle Region and Electro-mechanical Rehabilitation Works for Zahle Intermediate Reservoir, Water Treatment Plant and Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/zahle-project/4.jpg altEquipping of 3 Wells in Zahle Region and Electro-mechanical Rehabilitation Works for Zahle Intermediate Reservoir, Water Treatment Plant and Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/zahle-project/5.jpg altEquipping of 3 Wells in Zahle Region and Electro-mechanical Rehabilitation Works for Zahle Intermediate Reservoir, Water Treatment Plant and Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/zahle-project/6.jpg altEquipping of 3 Wells in Zahle Region and Electro-mechanical Rehabilitation Works for Zahle Intermediate Reservoir, Water Treatment Plant and Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/zahle-project/7.jpg altEquipping of 3 Wells in Zahle Region and Electro-mechanical Rehabilitation Works for Zahle Intermediate Reservoir, Water Treatment Plant and Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/zahle-project/8.jpg altEquipping of 3 Wells in Zahle Region and Electro-mechanical Rehabilitation Works for Zahle Intermediate Reservoir, Water Treatment Plant and Pumping Station /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/zahle-project/9.jpg altEquipping of 3 Wells in Zahle Region and Electro-mechanical Rehabilitation Works for Zahle Intermediate Reservoir, Water Treatment Plant and Pumping Station /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Equipping of 3 Wells in Zahle Region and Electro-mechanical Rehabilitation Works for Zahle Intermediate Reservoir, Water Treatment Plant and Pumping Station/h3> div classlocation>Zahle - Lebanon/div> div classdate>2019/div> div classdescriptions>Equipping of Zahle pump station with 4x 51 kW submersible booster pumps (installed in barrels), 4x 8.5 kW sump pumps, 4x 16.5 kW sump pumps. and gas chlorination system. Equipping Zahles water treatment plant with 2x 12.5 kW sump pumps and filtration system (1500m3/day). Equipping of Zahle municipalitys well with 45 kW submersible pumpset. Equipping of Wadi El Arayeshs well with 75 kW submersible pumpset. All submersible pumps equipped with VFD panels, sump pumps with autotransformer panels, ATS, and PLC./div> /div> /div> /div> /div> /div> div classmodal fade idtreatment-plant-4 tabindex-1 roledialog aria-labelledbytreatment-plant-4-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/private-project/1.jpg altSupply and Installation for RO unit /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/treatment-plant/private-project/1.jpg altSupply and Installation for RO unit /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Supply and Installation for RO unit/h3> div classlocation>Beirut - Lebanon/div> div classdate>2020/div> div classdescriptions>Supply and installation of a packaged RO unit to yield potable water for residential use./div> /div> /div> /div> /div> /div> div classmodal fade idpower-generation-1 tabindex-1 roledialog aria-labelledbypower-generation-1-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/power-generation/dai/1.jpg altSupply and Installation of Generators for Water Pumping Stations /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/power-generation/dai/2.jpg altSupply and Installation of Generators for Water Pumping Stations /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/power-generation/dai/3.jpg altSupply and Installation of Generators for Water Pumping Stations /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/power-generation/dai/4.jpg altSupply and Installation of Generators for Water Pumping Stations /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/power-generation/dai/5.jpg altSupply and Installation of Generators for Water Pumping Stations /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Supply and Installation of Generators for Water Pumping Stations/h3> div classlocation>Bekaa Region, South Region, Mount Lebanon Region - Lebanon/div> div classdate>2022/div> div classdescriptions>Supply and Installation of 9x power generating sets (60 KVA to 1000 KVA) including, fuel tanks, earthing system, ATS, and concrete foundations./div> /div> /div> /div> /div> /div> div classmodal fade idpower-generation-2 tabindex-1 roledialog aria-labelledbypower-generation-2-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/supply-generators-for-water/2.jpg altSupply and Installation of Generators for Water Pumping Stations /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/supply-generators-for-water/3.jpg altSupply and Installation of Generators for Water Pumping Stations /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Supply and Installation of Generators for Water Pumping Stations/h3> div classlocation>Beirut and Mount Lebanon Regions - Lebanon/div> div classdate>2021/div> div classdescriptions>Supply and Installation of 6x power generating sets (100 KVA to 500 KVA) including, fuel tanks, earthing system, ATS, and concrete foundations./div> /div> /div> /div> /div> /div> div classmodal fade idsolar-13 tabindex-1 roledialog aria-labelledbysolar-13-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/supply-installation/1.jpg altSupply and Installation of PV System for Dar Baachtar Well (North Lebanon) /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/supply-installation/2.jpg altSupply and Installation of PV System for Dar Baachtar Well (North Lebanon) /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/supply-installation/3.jpg altSupply and Installation of PV System for Dar Baachtar Well (North Lebanon) /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/supply-installation/4.jpg altSupply and Installation of PV System for Dar Baachtar Well (North Lebanon) /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/supply-installation/5.jpg altSupply and Installation of PV System for Dar Baachtar Well (North Lebanon) /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/supply-installation/6.jpg altSupply and Installation of PV System for Dar Baachtar Well (North Lebanon) /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/supply-installation/7.jpg altSupply and Installation of PV System for Dar Baachtar Well (North Lebanon) /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/supply-installation/8.jpg altSupply and Installation of PV System for Dar Baachtar Well (North Lebanon) /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/supply-installation/9.jpg altSupply and Installation of PV System for Dar Baachtar Well (North Lebanon) /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/supply-installation/10.jpg altSupply and Installation of PV System for Dar Baachtar Well (North Lebanon) /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/supply-installation/11.jpg altSupply and Installation of PV System for Dar Baachtar Well (North Lebanon) /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Supply and Installation of PV System for Dar Baachtar Well (North Lebanon)/h3> div classlocation>Dar Baachtar, Koura - Lebanon/div> div classdate>2024/div> div classdescriptions>Supply and installation of 187 kWp PV solar system including PV modules, steel structures, DC cables and inverters/div> /div> /div> /div> /div> /div> div classmodal fade idsolar-1 tabindex-1 roledialog aria-labelledbysolar-1-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/sada-pack/1.jpg altInstallation of PV Solar System for Sada Pack /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/sada-pack/2.jpg altInstallation of PV Solar System for Sada Pack /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/sada-pack/3.jpg altInstallation of PV Solar System for Sada Pack /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Installation of PV Solar System for Sada Pack/h3> div classlocation>Jiyeh, Chouf - Lebanon/div> div classdate>2022/div> div classdescriptions>Supply and installation of 1000 kWp PV solar system including PV modules, steel structures, DC cables and inverters./div> /div> /div> /div> /div> /div> div classmodal fade idsolar-2 tabindex-1 roledialog aria-labelledbysolar-2-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/jib-jennine-waste-water/1.jpg altInstallation of PV Solar System for Jib Jennine Waste Water Treatment Plant /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/jib-jennine-waste-water/2.jpg altInstallation of PV Solar System for Jib Jennine Waste Water Treatment Plant /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/jib-jennine-waste-water/3.jpg altInstallation of PV Solar System for Jib Jennine Waste Water Treatment Plant /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Installation of PV Solar System for Jib Jennine Waste Water Treatment Plant/h3> div classlocation>Jib Jennine, Western Bekaa - Lebanon/div> div classdate>2020/div> div classdescriptions>Supply and installation of 205 kWp PV solar system including PV modules, steel structures, DC cables and inverters./div> /div> /div> /div> /div> /div> div classmodal fade idsolar-3 tabindex-1 roledialog aria-labelledbysolar-3-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/amioun/1.jpg altInstallation of PV Solar System for Amioun Waste Water Recycling Plant /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/amioun/2.jpg altInstallation of PV Solar System for Amioun Waste Water Recycling Plant /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/amioun/3.jpg altInstallation of PV Solar System for Amioun Waste Water Recycling Plant /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/amioun/4.jpg altInstallation of PV Solar System for Amioun Waste Water Recycling Plant /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/amioun/5.jpg altInstallation of PV Solar System for Amioun Waste Water Recycling Plant /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/amioun/6.jpg altInstallation of PV Solar System for Amioun Waste Water Recycling Plant /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/amioun/7.jpg altInstallation of PV Solar System for Amioun Waste Water Recycling Plant /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Installation of PV Solar System for Amioun Waste Water Recycling Plant/h3> div classlocation>Amioun, Koura - Lebanon/div> div classdate>2021/div> div classdescriptions>Supply and installation of 260 kWp PV solar system including energy storage system (200 kWh), PV modules, steel structures, DC cables and inverters./div> /div> /div> /div> /div> /div> div classmodal fade idsolar-4 tabindex-1 roledialog aria-labelledbysolar-4-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/arsal/1.jpg altInstallation of PV Solar System for Arsal Waste Water Recycling Plant /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/arsal/2.jpg altInstallation of PV Solar System for Arsal Waste Water Recycling Plant /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/arsal/3.jpg altInstallation of PV Solar System for Arsal Waste Water Recycling Plant /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/arsal/4.jpg altInstallation of PV Solar System for Arsal Waste Water Recycling Plant /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Installation of PV Solar System for Arsal Waste Water Recycling Plant/h3> div classlocation>Arsal, Baalbak - Lebanon/div> div classdate>2022-2023/div> div classdescriptions>Supply and installation of 60 kWp PV solar system including 200 kWh energy storage system, PV modules, steel structures, DC cables and inverters./div> /div> /div> /div> /div> /div> div classmodal fade idsolar-5 tabindex-1 roledialog aria-labelledbysolar-5-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/sakr-plant/1.jpg altInstallation of PV Solar System for Sakr Plant /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/sakr-plant/2.jpg altInstallation of PV Solar System for Sakr Plant /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/sakr-plant/3.jpg altInstallation of PV Solar System for Sakr Plant /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Installation of PV Solar System for Sakr Plant/h3> div classlocation>Choueifat, Aley - Lebanon/div> div classdate>2022/div> div classdescriptions>Supply and installation of 202 kWp PV solar system including PV modules, steel structures, DC cables and inverters./div> /div> /div> /div> /div> /div> div classmodal fade idsolar-6 tabindex-1 roledialog aria-labelledbysolar-6-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/alma-el-chaab/1.jpg altInstallation of PV Solar System for Alma El Chaab /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/alma-el-chaab/2.jpg altInstallation of PV Solar System for Alma El Chaab /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/alma-el-chaab/3.jpg altInstallation of PV Solar System for Alma El Chaab /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/alma-el-chaab/4.jpg altInstallation of PV Solar System for Alma El Chaab /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Installation of PV Solar System for Alma El Chaab/h3> div classlocation>Alma El Chaab, Tyr - Lebanon/div> div classdate>2022-2023/div> div classdescriptions>Supply and installation of 200 kWp PV solar system including PV modules, steel structures, DC cables and inverters./div> /div> /div> /div> /div> /div> div classmodal fade idsolar-7 tabindex-1 roledialog aria-labelledbysolar-7-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/hasbaya/1.jpg altInstallation of PV Solar System for Hasbaya /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/hasbaya/2.jpg altInstallation of PV Solar System for Hasbaya /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/hasbaya/3.jpg altInstallation of PV Solar System for Hasbaya /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Installation of PV Solar System for Hasbaya/h3> div classlocation>Hasbaya - Lebanon/div> div classdate>2022-2023/div> div classdescriptions>Supply and installation of 100 kWp PV solar system including PV modules, steel structures, DC cables and inverters./div> /div> /div> /div> /div> /div> div classmodal fade idsolar-8 tabindex-1 roledialog aria-labelledbysolar-8-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/fekha/1.jpg altInstallation of PV Solar System for Fekha /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/fekha/2.jpg altInstallation of PV Solar System for Fekha /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/fekha/3.jpg altInstallation of PV Solar System for Fekha /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/fekha/4.jpg altInstallation of PV Solar System for Fekha /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Installation of PV Solar System for Fekha/h3> div classlocation>Fekha, Baalbak - Lebanon/div> div classdate>2022-2023/div> div classdescriptions>Supply and installation of 100 kWp PV solar system including PV modules, steel structures, DC cables and inverters./div> /div> /div> /div> /div> /div> div classmodal fade idsolar-9 tabindex-1 roledialog aria-labelledbysolar-9-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/abasieh/1.jpg altInstallation of PV Solar System for Abasieh /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/abasieh/2.jpg altInstallation of PV Solar System for Abasieh /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/abasieh/3.jpg altInstallation of PV Solar System for Abasieh /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/abasieh/4.jpg altInstallation of PV Solar System for Abasieh /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Installation of PV Solar System for Abasieh/h3> div classlocation>Abasieh, West Bekaa - Lebanon/div> div classdate>2022/div> div classdescriptions>Supply and installation of 80 kWp PV solar system including PV modules, steel structures, DC cables and inverters./div> /div> /div> /div> /div> /div> div classmodal fade idsolar-10 tabindex-1 roledialog aria-labelledbysolar-10-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/iaat/1.jpg altInstallation of PV Solar System for Iaat /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/iaat/2.jpg altInstallation of PV Solar System for Iaat /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Installation of PV Solar System for Iaat/h3> div classlocation>Iaat, Baalbak - Lebanon/div> div classdate>2022-2023/div> div classdescriptions>Supply and installation of 80 kWp PV solar system including 288 kWh energy storage system, PV modules, steel structures, DC cables and inverters./div> /div> /div> /div> /div> /div> div classmodal fade idsolar-11 tabindex-1 roledialog aria-labelledbysolar-11-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/qalhat/1.jpg altInstallation of PV Solar System for Qalhat /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/qalhat/2.jpg altInstallation of PV Solar System for Qalhat /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/qalhat/3.jpg altInstallation of PV Solar System for Qalhat /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Installation of PV Solar System for Qalhat/h3> div classlocation>QaIhat, Koura - Lebanon/div> div classdate>2020-2021/div> div classdescriptions>Supply and installation of 10 kWp PV solar system including energy storage system, PV modules, steel structures, DC cables and inverters./div> /div> /div> /div> /div> /div> div classmodal fade idsolar-12 tabindex-1 roledialog aria-labelledbysolar-12-label aria-hiddentrue> div classmodal-dialog modal-dialog-centered roledocument> div classmodal-content> div classrow m-0> div classswiper> div classswiper-wrapper> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/qaa/1.jpg altInstallation of PV Solar System for Qaa /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/qaa/2.jpg altInstallation of PV Solar System for Qaa /> /div> /div> div classswiper-slide> div> img loadinglazy src./assets/imgs/projects/solar-system/qaa/3.jpg altInstallation of PV Solar System for Qaa /> /div> /div> /div> div classswiper-btn swiper-button-prev>/div> div classswiper-btn swiper-button-next>/div> /div> /div> div classinfo-bar row m-0> button typebutton classclose data-dismissmodal aria-labelClose> span aria-hiddentrue>×/span> /button> div classcol-md-12> h3>Installation of PV Solar System for Qaa/h3> div classlocation>Qaa, Baalbak - Lebanon/div> div classdate>2020/div> div classdescriptions>Supply and installation of 155 kWp PV solar system including PV modules, steel structures, DC cables and inverters./div> /div> /div> /div> /div> /div> !-- Modals End --> /div> !-- jequery plugins --> script srcassets/js/jquery.js>/script> script srcassets/js/popper.min.js>/script> script srcassets/js/bootstrap.min.js>/script> script srcassets/js/owl.js>/script> script srcassets/js/wow.js>/script> script srcassets/js/validation.js>/script> script srcassets/js/jquery.fancybox.js>/script> script srcassets/js/appear.js>/script> script srcassets/js/scrollbar.js>/script> script srcassets/js/jquery-ui.js>/script> script srcassets/js/pagenav.js>/script> script srcassets/js/isotope.js>/script> script srcassets/js/jquery.nice-select.min.js>/script> script srchttps://cdn.jsdelivr.net/npm/swiper@9/swiper-bundle.min.js>/script> !-- main-js --> script srcassets/js/script.js>/script> script> var curpage 1; var sliding false; var click true; var left document.getElementById(left); var right document.getElementById(right); var pagePrefix slide; var pageShift 500; var transitionPrefix circle; var svg true; var totalSlides 11; function leftSlide() { if (click) { if (curpage 1) curpage totalSlides + 1; // console.log(woek); sliding true; curpage--; svg true; click false; for (k 1; k totalSlides; k++) { var a1 document.getElementById(pagePrefix + k); console.log(this is s1 + a1); a1.className + tran; } setTimeout(() > { move(); }, 200); setTimeout(() > { for (k 1; k totalSlides; k++) { var a1 document.getElementById(pagePrefix + k); a1.classList.remove(tran); } }, 1400); } } let intervalId; // Variable to store the interval ID // Function to start the automatic slide interval function startSlideInterval() { intervalId setInterval(function() { rightSlide(); }, 7000); } // Start the automatic slide interval initially startSlideInterval(); // Function to handle right slide transition function rightSlide() { if (click) { clearInterval(intervalId); // Clear the interval if clicked if (curpage totalSlides) curpage 0; // console.log(woek); sliding true; curpage++; svg false; click false; for (let k 1; k totalSlides; k++) { var a1 document.getElementById(pagePrefix + k); a1.className + tran; } setTimeout(() > { move(); }, 200); setTimeout(() > { for (let k 1; k totalSlides; k++) { var a1 document.getElementById(pagePrefix + k); a1.classList.remove(tran); } startSlideInterval(); // Restart the interval after transition is complete }, 1400); } } function move() { // Your move logic goes here } function move() { if (sliding) { sliding false; if (svg) { for (j 1; j 9; j++) { var c document.getElementById(transitionPrefix + j); c.classList.remove(steap); c.setAttribute(class, transitionPrefix + j + streak); // console.log(streak); } } else { for (j 10; j 18; j++) { var c document.getElementById(transitionPrefix + j); c.classList.remove(steap); c.setAttribute(class, transitionPrefix + j + streak); // console.log(streak); } } setTimeout(() > { for (i 1; i totalSlides; i++) { if (i curpage) { var a document.getElementById(pagePrefix + i); a.className + up1; } else { var b document.getElementById(pagePrefix + i); b.classList.remove(up1); } } sliding true; }, 600); setTimeout(() > { click true; }, 1700); setTimeout(() > { if (svg) { for (j 1; j 9; j++) { var c document.getElementById(transitionPrefix + j); c.classList.remove(streak); c.setAttribute(class, transitionPrefix + j + steap); } } else { for (j 10; j 18; j++) { var c document.getElementById(transitionPrefix + j); c.classList.remove(streak); c.setAttribute(class, transitionPrefix + j + steap); } sliding true; } }, 850); setTimeout(() > { click true; }, 1700); } } left.onmousedown () > { var up2 document.getElementsByClassName(up2); for (var i 0; i up2.length; i++) { up2i.style.zIndex 42; } leftSlide(); setTimeout(() > { for (var i 0; i up2.length; i++) { up2i.style.zIndex 10; } }, 1700); }; right.onmousedown () > { var up2 document.getElementsByClassName(up2); for (var i 0; i up2.length; i++) { up2i.style.zIndex 42; } rightSlide(); setTimeout(() > { for (var i 0; i up2.length; i++) { up2i.style.zIndex 10; } }, 1700); }; document.onkeydown (e) > { if (e.keyCode 37) { leftSlide(); } else if (e.keyCode 39) { rightSlide(); } }; const faq document.querySelector(.faq); const tabs ...faq.querySelectorAll(nav .tab); const content ...faq.querySelectorAll(.content p); tabs.forEach((tab) > tab.addEventListener(click, (e) > { for (p of content) p.classList.remove(active); for (tab of tabs) tab.classList.remove(active); const index tabs.indexOf(e.target); if (index ! -1) { e.target.classList.add(active); contentindex.classList.add(active); } }) ); /script> script> const swiper new Swiper(.swiper, { speed: 400, spaceBetween: 15, slidesPerView: 2, loop: false, navigation: { nextEl: .swiper-button-next, prevEl: .swiper-button-prev, }, slidesPerGroup: 1, // autoplay: { // delay: 2000, // }, breakpoints: { 0: { slidesPerView: 1, }, 576: { slidesPerView: 2, }, 991: { slidesPerView: 2, }, }, }); /script> script> // $(selector).attrchange(): a call back function for when an attribute changes // // can return attribute changes for selector (function($) { var MutationObserver window.MutationObserver || window.WebKitMutationObserver || window.MozMutationObserver; $.fn.attrchange function(callback) { if (MutationObserver) { var options { subtree: false, attributes: true }; var observer new MutationObserver(function(mutations) { mutations.forEach(function(e) { callback.call(e.target, e.attributeName); }); }); return this.each(function() { observer.observe(this, options); }); } } })(jQuery); // when one details opens, close the others $(.details-item).attrchange(function(attribute) { if (attribute open && $(this).attr(open)) { $(this).siblings(.details-item).removeAttr(open); $(.four-item-carousel).owlCarousel(refresh); } }); // keyboard: prevent closing the open details to emulate tabs $(.details-tab).on(keydown, function(e) { if (e.keyCode 32 || e.keyCode 13) { if ($(this).parent().attr(open)) { e.preventDefault(); } } }); // mouse: prevent closing the open details to emulate tabs $(.details-tab).on(click, function(e) { if ($(this).parent().attr(open)) { e.preventDefault(); } }); /script> !-- MDB --> script typetext/javascript srchttps://cdnjs.cloudflare.com/ajax/libs/mdb-ui-kit/5.0.0/mdb.min.js>/script>/body>!-- End of .page_wrapper -->/html>
View on OTX
|
View on ThreatMiner
Please enable JavaScript to view the
comments powered by Disqus.
Data with thanks to
AlienVault OTX
,
VirusTotal
,
Malwr
and
others
. [
Sitemap
]